[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267264":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1267264,854,3,"判断题","停止点在本质上是施工过程中的某一个工序，一个工序完成两个作业内容。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"停止点的概念：所有的控制点、检查点、停止点等“点”的称谓，本质上是施工过程中的某一个工序。一个工序完成一个作业内容，只有完成该工序的作业内容，才能开始下一个作业内容，即进入下道工序。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]