[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267253":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1267253,854,3,"判断题","工程质量三个阶段的控制中，事后控制的重点是发现质量缺陷并提出整改方案。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"控制的重点是工序质量、工作质量和质量控制点的控制。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]