[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267202":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1267202,854,3,"判断题","采暖系统应随施工进度对于节能有关的隐蔽部位或内容进行验收，并应有详细的文字记录和必要的图像资料。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]