[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267187":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1267187,854,3,"判断题","建筑物土建施工时的预留工作委托其他专业公司实施，要提供详细对的预留施工图，并派员实施指导或复核。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"如建筑物土建施工时的预埋、预留工作委托其他专业公司实施，要提供详细对的预留、预埋施工图，并派员实施指导或复核。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]