[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267155":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":19},1267155,854,3,"判断题","通风与空调工程带生产负荷的综合效能试验与调整，应在已具备生产试运行的条件下进行，由建设单位负责，设计、施工单位配合。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,"通风与空调工程带生产负荷的综合效能试验与调整，应在已具备生产试运行的条件下进行，由建设单位负责，设计、施工单位配合",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]