[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267043":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1267043,854,3,"判断题","管道试压当中的系统试压指在干管敷设完毕后按设计和规范要求进行的水试压。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"系统试压是在全部干、立、支管安装完毕，按设计或规范要求进行的水压试验。",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]