[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1267020":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1267020,854,3,"判断题","验收记录应经参与验收的人员签字确认，而不合格通知单不需要。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"验收记录或不合格通知单均应经参与验收的人员签字确认。教教材第七章第一节P61。单选题",{"id":6,"name":21,"category":22,"favorite":23},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]