[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266911":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1266911,854,2,"多选题","施工现场的工程质量控制包括（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","对影响施工质量因素的控制",true,{"key":16,"text":17,"correct":18},"B","制定质量方针和质量目标",false,{"key":20,"text":21,"correct":14},"C","施工过程事先、事中、事后三阶段的质量控制",{"key":23,"text":24,"correct":18},"D","质量保证和质量改进",{"key":26,"text":27,"correct":18},"E","施工过程事中、事后二阶段的质量控制","AC","施工现场的工程质量控制有两个方面，即对影响施工质量因素的控制和施工过程事先、事中、事后三阶段的质量控制。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]