[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266897":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1266897,854,2,"多选题","系统安装完成后，应在供暖期内与热源联合试运转和调试。联合试运转和调试结果应符合设计要求，供暖房间温度相对于设计计算温度不得低于（ ），且不高于（ ）。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","4℃",false,{"key":16,"text":17,"correct":18},"B","2℃",true,{"key":20,"text":21,"correct":18},"C","1℃",{"key":23,"text":24,"correct":14},"D","3℃",{"key":26,"text":27,"correct":14},"E","5℃","BC","",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]