[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266844":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1266844,854,2,"多选题","闭式系统管路应在最高处及所有可能积聚空气的高点设置（ ），在管路最低点应设置（ ）及（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","排水管",true,{"key":16,"text":17,"correct":14},"B","排水阀",{"key":19,"text":20,"correct":21},"C","自动排气阀",false,{"key":23,"text":24,"correct":21},"D","泄水阀",{"key":26,"text":27,"correct":14},"E","排气阀","ABE","",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]