[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266776":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1266776,854,2,"多选题","建筑给水排水及采暖工程的分项工程，应按（ ）或（ ）等划分。分项工程应划分成若干个检验批进行验收。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","系统",true,{"key":16,"text":17,"correct":14},"B","区域",{"key":19,"text":20,"correct":14},"C","施工段",{"key":22,"text":23,"correct":24},"D","专业",false,{"key":26,"text":27,"correct":14},"E","楼层","ABCE","",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]