[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266745":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1266745,854,2,"多选题","质量员将验收合格的检验批，填好表格后交监理（建设）单位有关人员，有关人员应及时验收，可采取（ ）来确定是否通过验收。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","抽样方法",true,{"key":16,"text":17,"correct":14},"B","宏观检查方法",{"key":19,"text":20,"correct":14},"C","必要时抽样检测",{"key":22,"text":23,"correct":24},"D","抽样检测",false,{"key":26,"text":27,"correct":24},"E","全数检测","ABC","质量员将验收合格的检验批，填好表格后交监理（建设）单位有关人员，有关人员应及时验收，可采取抽样方法、宏观检查方法、必要时抽样检测来确定是否通过验收。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]