[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266708":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1266708,854,1,"单选题","质量计划编制的主要内容，施工准备计划不包括（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","技术准备",false,{"key":16,"text":17,"correct":14},"B","物资准备",{"key":19,"text":20,"correct":14},"C","劳动组织准备",{"key":22,"text":23,"correct":24},"D","施工方案准备",true,"质量计划编制的主要内容，施工准备计划包括技术准备、物资准备、劳动组织准备和施工现场准备等。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]