[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266704":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1266704,854,1,"单选题","质量计划编制的主要内容，确定各项管理体系的流程和措施不包括（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","员工培训措施",true,{"key":16,"text":17,"correct":18},"B","技术措施",false,{"key":20,"text":21,"correct":18},"C","组织措施",{"key":23,"text":24,"correct":18},"D","质量保证措施和安全施工措施","质量计划编制的主要内容，确定各项管理体系的流程和措施包括技术措施、组织措施、质量保证措施和安全施工措施等。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]