[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266686":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1266686,854,1,"单选题","每一个质量控制具体方法本身也有一个持续改进的问题，就要用（ ）循环原理，在实践中使质量控制得到不断提高。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","看、摸、敲、照四个字",false,{"key":16,"text":17,"correct":14},"B","目测法、实测法和试验法三种",{"key":19,"text":20,"correct":14},"C","靠、吊、量、套四个字",{"key":22,"text":23,"correct":24},"D","计划、实施、检查和改进",true,"每一个质量控制具体方法本身也有一个持续改进的问题，就要用计划、实施、检查、改进循环原理，在实践中使质量控制得到不断提高。第三节质量控制点的设置Z4.3.1质量控制点的定义和特性。（P46）",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]