[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266678":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1266678,854,1,"单选题","影响工程质量控制的因素主要有（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工人员、施工用机械和施工用材料",false,{"key":16,"text":17,"correct":18},"B","施工人员、施工用机械、施工的材料、施工用方法和施工作业环境",true,{"key":20,"text":21,"correct":14},"C","施工用机械、施工用材料、施工的方法和施工作业环境",{"key":23,"text":24,"correct":14},"D","施工人员、施工用机械、施工用材料和施工作业环境","影响工程质量控制的因素主要有施工人员、施工用机械、施工用材料、施工的方法、施工作业环境五个方面。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]