[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266674":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1266674,854,1,"单选题","施工企业对已具有成熟的分项工程级的工艺标准情况下和采用（ ）情况下，要区别对待编制质量计划的要求。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","新规范",false,{"key":16,"text":17,"correct":18},"B","“四新”",true,{"key":20,"text":21,"correct":14},"C","新技术",{"key":23,"text":24,"correct":14},"D","新设备","所谓工程实体对质量计划编制的影响是指施工企业对已具有成熟的分项工程级的工艺标准情况下和采用“四新”情况下，要区别对待编制质量计划的要求。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]