[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266667":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1266667,854,1,"单选题","由专业承包单位施工的分部（分项）工程或专项工程的施工方案，应由专业承包单位技术负责人或技术负责人授权的技术人员（ ）。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","编写",false,{"key":16,"text":17,"correct":14},"B","审核",{"key":19,"text":20,"correct":21},"C","审批",true,{"key":23,"text":24,"correct":14},"D","审查","由专业承包单位施工的分部（分项）工程或专项工程的施工方案，应由专业承包单位技术负责人或技术负责人授权的技术人员审批。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]