[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266651":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1266651,854,1,"单选题","PP-R管在各配水点、受力点、穿墙只管节点等处，均应有（ ）或支架固定。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","法兰",false,{"key":16,"text":17,"correct":14},"B","螺栓",{"key":19,"text":20,"correct":21},"C","管卡",true,{"key":23,"text":24,"correct":14},"D","接头","PP-R管在各配水点、受力点、穿墙只管节点等处，均应有管卡或支架固定。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]