[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266632":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1266632,854,1,"单选题","施工阶段质量控制的目标是（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","制定质量目标、规定过程和资源，以实现其目的",false,{"key":16,"text":17,"correct":14},"B","致力于提供质量要求得到满足的信任",{"key":19,"text":20,"correct":14},"C","增强满足质量要求的能力",{"key":22,"text":23,"correct":24},"D","确保工序质量合格；杜绝质量事故发生",true,"事中质量控制的目标是确保工序质量合格，杜绝质量事故发生。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]