[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266609":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1266609,854,1,"单选题","不属于质量计划编制依据（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","设备清单及主要材料或大宗材料清单。",false,{"key":16,"text":17,"correct":14},"B","现场情况调查资料",{"key":19,"text":20,"correct":14},"C","新材料、新工艺的使用说明或试验资料",{"key":22,"text":23,"correct":24},"D","施工方案",true,"质量计划编制依据：工程施工合同及相关的协议；已批准的初步设计及有关的图纸资料；工程概算和主要工程量；设备清单及主要材料或大宗材料清单；现场情况调查资料；新材料、新工艺的使用说明或试验资料；其他。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]