[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266600":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1266600,854,1,"单选题","质量资料收集的要点（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","及时参与施工活动",true,{"key":16,"text":17,"correct":18},"B","整理后要有台账记录",false,{"key":20,"text":21,"correct":18},"C","整理中对作业队组提供的资料有疑问不要涂改，应找提供者澄清",{"key":23,"text":24,"correct":18},"D","要按不同专业、不同种类划分，形成时间先后顺序进行整理组卷","质量资料收集的要点：及时参与施工活动；保持与工程进度同步；认真把关。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]