[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266460":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1266460,854,1,"单选题","变压器安装就位且高低压开关柜安装完成后，应进行（ ）的连接，将变压器的高压侧与高压开关柜的出线侧连接，低压侧与低压开关柜的进线侧连接。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","一次线",true,{"key":16,"text":17,"correct":18},"B","二次线",false,{"key":20,"text":21,"correct":18},"C","接地线",{"key":23,"text":24,"correct":18},"D","零线","变压器安装就位且高低压开关柜安装完成后，应进行一次线的连接，将变压器的高压侧与高压开关柜的出线侧连接，低压侧与低压开关柜的进线侧连接，变压器的接地螺栓与接地干线（PE）连接。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]