[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266379":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1266379,854,1,"单选题","减压板安装的部位应是在较长的直管段上，且其前面的长度不小于（ ）倍管径。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","2",false,{"key":16,"text":17,"correct":14},"B","5",{"key":19,"text":20,"correct":14},"C","8",{"key":22,"text":23,"correct":24},"D","10",true,"安装要求：安装方向、锥形部分应在管道的下游方向；需安装在较长的直管道上其前面的长度不小于10倍管径。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]