[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266302":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1266302,854,1,"单选题","按照《通风与空调工程施工质量验收规范》GB50243-2002要对安装完毕的空调水系统管道系统进行（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","水压试验",true,{"key":16,"text":17,"correct":18},"B","满水试验",false,{"key":20,"text":21,"correct":18},"C","灌水试验",{"key":23,"text":24,"correct":18},"D","通球试验","空调水系统管道系统安装完毕应按设计要求做水压实验。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]