[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266282":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1266282,854,1,"单选题","《建筑工程施工质量验收统一标准》GB50300一2013规定隐蔽工程在隐蔽前，施工单位应当通知（ ）进行验收。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","建设单位",false,{"key":16,"text":17,"correct":14},"B","建设行政主管部门",{"key":19,"text":20,"correct":14},"C","工程质量监督机构",{"key":22,"text":23,"correct":24},"D","监理单位",true,"《建筑工程施工质量验收统一标准》GB50300一2013规定隐蔽工程在隐蔽前，施工单位应当通知监理单位进行验收。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]