[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266265":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1266265,854,1,"单选题","工程质量监督机构应在工程竣工验收之日起（ ）日内，向备案机关提交工程质量监督报告。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","5",true,{"key":16,"text":17,"correct":18},"B","10",false,{"key":20,"text":21,"correct":18},"C","15",{"key":23,"text":24,"correct":18},"D","20","工程质量监督机构应在工程竣工验收之日起5日内，向备案机关提交工程质量监督报告。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)专业管理实务 岗位知识","建筑工程",0]