[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1266237":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1266237,853,2,"多选题","建设工程实行总包与分包的，应满足的条件是（ ）。",[11,15,18,21,24],{"key":12,"text":13,"correct":14},"A","总包单位应将工程发包给具有资质等级条件的分包单位",true,{"key":16,"text":17,"correct":14},"B","总承包单位进行分包，应经建设单位的认可",{"key":19,"text":20,"correct":14},"C","建筑工程的主体结构不得进行分包",{"key":22,"text":23,"correct":14},"D","分包单位不得再分包",{"key":25,"text":26,"correct":27},"E","分包单位可以再分包",false,"ABCD","实行总包与分包的工程，总包单位应将工程发包给具有资质等级条件的分包单位；总承包单位进行分包，应经建设单位的认可；实行总承包的，建筑工程的主体结构不得进行分包；实行总分包的工程，分包单位不得再分包。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)基础知识","建筑工程",0]