[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265948":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1265948,853,1,"单选题","项目成本管理应遵循的程序不包括：（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","掌握生产要素的市场价格的变动状态",false,{"key":16,"text":17,"correct":14},"B","确定项目合同价",{"key":19,"text":20,"correct":14},"C","编制成本计划，确定成本实施目标",{"key":22,"text":23,"correct":24},"D","材料管理考核",true,"项目成本管理应遵循下列程序：掌握生产要素的市场价格的变动状态；确定项目合同价；编制成本计划，确定成本实施目标；进行成本动态控制，实现成本实施目标；进行项目成本核算和工程价款结算，及时收回工程款；进行项目成本分析；进行项目成本考核，编制成本报告；积累项目成本资料。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]