[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265853":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1265853,853,1,"单选题","某建筑工程公司作为总承包商承接了某单位迁建工程所有项目的施工任务，项目包括办公楼、住宅楼和综合楼各一栋。该公司针对整个迁建工程项目制定的施工组织设计属于（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","施工组织总设计",true,{"key":16,"text":17,"correct":18},"B","单位工程施工组织设计",false,{"key":20,"text":21,"correct":18},"C","分部分项工程施工组织设计",{"key":23,"text":24,"correct":18},"D","季、月、旬施工计划","针对整个迁建工程项目制定的施工组织设计属于施工组织总设计。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]