[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265852":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1265852,853,1,"单选题","组合式空调机组安装中，空气设备与管道连接时，应设置（ ）",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","法兰连接",false,{"key":16,"text":17,"correct":14},"B","焊接连接",{"key":19,"text":20,"correct":14},"C","咬口连接",{"key":22,"text":23,"correct":24},"D","软连接",true,"通风与空调设备的安装中，组合式空调机组安装前设备安装基础已经检验合格，各功能段符合要求，外表及内部清洁干净。设备安装平整，采用隔振装置时，其隔振安装位置和数量应正确，空气处理设备与管道连接时，应设置软连接。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]