[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265746":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1265746,853,1,"单选题","下列关于桅杆起重机安装中地锚的说法，正确的是（ ）",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","应根据设备位置和使用工况选用地锚",false,{"key":16,"text":17,"correct":18},"B","全埋式地锚适用于有开挖条件的场地",true,{"key":20,"text":21,"correct":14},"C","压重式地锚多在大型吊装中使用",{"key":23,"text":24,"correct":14},"D","利用已有建筑物作为地锚，必须获得建筑物使用单位的同意","目前桅杆起重机安装常用的地锚结构形式有全埋式地锚、半埋式地锚、压重式活动地锚等数种。应根据受力条件和施工区域的土质情况选用合适的地锚结构。①全埋式地锚适用于有开挖条件的场地。全埋式地锚可以承受较大的拉力，多在大型吊装中使用。②压重式活动地锚适用于地下水位较高或土质较软等不便深度开挖的场地。小型压重式活动式地锚承受的力不大，多在改、扩建工程的吊装作业中使用。在施工中，利用已有建筑物作为地锚，如混凝土基础、混凝土构筑物等，应进行强度验算并采取可靠的防护措施，并获得建筑物设计单位的书面认可。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]