[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265633":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1265633,853,1,"单选题","根据安装测量的一般程序，“设置标高基准点”的下一个步骤是（ ）。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","设置纵横中心线",false,{"key":16,"text":17,"correct":18},"B","设置沉降观测点",true,{"key":20,"text":21,"correct":14},"C","安装过程检测控制",{"key":23,"text":24,"correct":14},"D","实测记录","设置标高基准点之后设置沉降观测点",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]