[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265604":3},{"question":4,"library":19},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":13,"analysis":9},1265604,853,3,"判断题","高程控制点布设时，测区的高程系统宜采用国家高程基准。在已有高程控制网的地区进行测量时，可沿用原高程系统。当小测区联测有困难时，亦可采用假定高程系统。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",true,{"key":16,"text":17,"correct":18},"B","错误",false,{"id":6,"name":20,"category":21,"favorite":22},"(设备安装质量)基础知识","建筑工程",0]