[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265526":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":19,"analysis":25},1265526,853,1,"单选题","下列对机电工程投标的条件描述错误的一项是。",[11,15,18,22],{"key":12,"text":13,"correct":14},"A","机电工程项目已具备招标条件",false,{"key":16,"text":17,"correct":14},"B","投标人资格已符合规定.并对招标文件作出实质性响应",{"key":19,"text":20,"correct":21},"C","投标人已按招标文件要求编制了投标程序",true,{"key":23,"text":24,"correct":14},"D","投标人已按招标文件要求提交了投标保证金","C选项正确的描述方式为“投标人已按招标文件要求编制了投标文件”。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]