[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265375":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":16,"analysis":25},1265375,853,1,"单选题","原边绕组又称初级绕组，与（ ）相连，副边绕组又称次级绕组，与（ ）相连。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","负载电源",false,{"key":16,"text":17,"correct":18},"B","电源负载",true,{"key":20,"text":21,"correct":14},"C","电源电源",{"key":23,"text":24,"correct":14},"D","负载负载","如图12～32所示，如原边绕组N1的线圈数多于副边绕组N2的线圈数，则为降压变压器，反之则为升压变压器。原边绕组又称初级绕组，与电源相连，副边绕组又称次级绕组，与负载相连。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]