[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265328":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1265328,853,1,"单选题","工业炉窑砌筑工程的工序交接证明书中，炉体冷却装置、管道和炉壳应有试压记录及（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","超声波探伤记录",false,{"key":16,"text":17,"correct":14},"B","试运转合格的记录",{"key":19,"text":20,"correct":14},"C","压力容器施工许可证明",{"key":22,"text":23,"correct":24},"D","焊接严密性试验验收合格的证明",true,"碑工业炉窑砌筑工程的工序交接证明书应包括的内容有：①炉子中心线和控制标高的测量记录及必要的沉降观测点的测量记录；②隐蔽工程的验收合格证明；③炉体冷却装置、管道和炉壳的试压记录及焊接严密性试验验收合格的证明；④钢结构和炉内轨道等安装位置的主要尺寸的复测记录；⑤可动炉子或炉子的可动部分的试运转合格的证明；⑥炉内托砖板和锚固件等的位置、尺寸及焊接质量的检查合格的证明；⑦上道工序成果的保护要求。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]