[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265321":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1265321,853,1,"单选题","电缆敷设时，油浸纸质绝缘电力电缆切断后，必须（ ）。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","保证切断处高于邻近两侧电缆",false,{"key":16,"text":17,"correct":14},"B","做防潮封端",{"key":19,"text":20,"correct":14},"C","压板固定",{"key":22,"text":23,"correct":24},"D","铅封",true,"电力电缆线路敷设时，电缆应在切断后，4h之内进行封头。塑料绝缘电力电缆应有防潮的封端：油浸纸质绝缘电力电缆必须铅封；充油电缆切断处必须高于邻近两侧电缆。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]