[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265274":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1265274,853,2,"多选题","卫生器具安装完毕后应做的试验有（ ）。",[11,15,18,22,25],{"key":12,"text":13,"correct":14},"A","水压试验",false,{"key":16,"text":17,"correct":14},"B","真空试验",{"key":19,"text":20,"correct":21},"C","满水试验",true,{"key":23,"text":24,"correct":21},"D","通水试验",{"key":26,"text":27,"correct":14},"E","通球试验","CD","卫生器具交工前应做满水和通水试验",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)基础知识","建筑工程",0]