[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265270":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1265270,853,1,"单选题","某安装公司中标了C市一大型写字楼机电安装工程，内容包含室内给水排水、电气照明、配电房、通风与空调系统、消防及智能化监控系统等。项目部在施工过程中严格遵守施工规范及验收标准，利用PDCA循环加强质量控制。项目最终验收合格，顺利投人使用。根据背景材料，回答以下问题。 通风与空调工程交工前，项目上进行了综合效能的测定与调整，应由（ ）负责实施。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","建设单位",true,{"key":16,"text":17,"correct":18},"B","设计单位",false,{"key":20,"text":21,"correct":18},"C","监理单位",{"key":23,"text":24,"correct":18},"D","施工单位","通风与空调工程交工前，项目上进行了综合效能的测定与调整，应由建设单位负责实施。",{"id":6,"name":27,"category":28,"favorite":29},"(设备安装质量)基础知识","建筑工程",0]