[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1265210":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1265210,853,2,"多选题","建筑电气工程图包含（ ）。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","系统图",true,{"key":16,"text":17,"correct":14},"B","电路图",{"key":19,"text":20,"correct":14},"C","平面图",{"key":22,"text":23,"correct":24},"D","风管系统图",false,{"key":26,"text":27,"correct":24},"E","电气图","ABC","建筑电气工程图：无论是系统图、电路图或者是平面图，阅读顺序是从电源开始到用电终点为止。",{"id":6,"name":31,"category":32,"favorite":33},"(设备安装质量)基础知识","建筑工程",0]