[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264708":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":22,"analysis":25},1264708,852,1,"单选题","以下不属于施工项目安全控制措施的是( )。",[11,15,18,21],{"key":12,"text":13,"correct":14},"A","安全制度措施",false,{"key":16,"text":17,"correct":14},"B","安全组织措施",{"key":19,"text":20,"correct":14},"C","安全技术措施",{"key":22,"text":23,"correct":24},"D","安全行政措施",true,"",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-通用基础","建筑工程",0]