[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-851-7":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":322},{"id":5,"name":6,"category":7,"favorite":8},851,"装饰方向-岗位技能","建筑工程",0,7,50,397,[13,28,34,40,46,52,58,64,70,76,82,88,94,100,106,112,118,124,130,136,142,148,154,160,166,172,178,184,190,196,202,208,214,220,226,232,238,244,250,256,262,268,274,280,286,292,298,304,310,316],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":21,"analysis":27},1264420,3,"判断题","拉铆枪主要有手动拉铆枪、电动拉铆枪和风动拉铆枪三种。",[19,23],{"key":20,"text":21,"correct":22},"A","正确",true,{"key":24,"text":25,"correct":26},"B","错误",false,"",{"id":29,"libraryId":5,"type":15,"typeLabel":16,"stem":30,"options":31,"answer":25,"analysis":27},1264421,"电钻外壳要采取接零或接地保护措施。电源插销正常插好后,可以直接使用。",[32,33],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":25,"analysis":27},1264422,"切割时,应使材料有一个与切割片同等厚度的刀口,为保证切割精度,应将切割线对准切割片的中线。",[38,39],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":41,"libraryId":5,"type":15,"typeLabel":16,"stem":42,"options":43,"answer":21,"analysis":27},1264423,"空气压缩机在正常运转时不得断开电源,如因故障断电时,必须将储气罐中空气排空后再重新启动。",[44,45],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":47,"libraryId":5,"type":15,"typeLabel":16,"stem":48,"options":49,"answer":25,"analysis":27},1264424,"滑轮组的定、动滑轮之间严防过分靠近,一般应保持1～1.5m的最小距离。",[50,51],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":53,"libraryId":5,"type":15,"typeLabel":16,"stem":54,"options":55,"answer":21,"analysis":27},1264425,"使用前应检查滑轮的轮槽、轮轴、颊板、吊钩等部分有无裂缝或损伤,滑轮转动是否灵活,润滑是否良好,同时滑轮槽宽应比钢丝绳直径大1～2.5mm。",[56,57],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":59,"libraryId":5,"type":15,"typeLabel":16,"stem":60,"options":61,"answer":25,"analysis":27},1264426,"常用设备吊装时钢丝绳安全系数不小于5。",[62,63],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":65,"libraryId":5,"type":15,"typeLabel":16,"stem":66,"options":67,"answer":21,"analysis":27},1264427,"施工电梯安装后,安全装置要经试验、检测合格后方可操作使用,电梯必须由持证的专业司机操作。",[68,69],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":71,"libraryId":5,"type":15,"typeLabel":16,"stem":72,"options":73,"answer":25,"analysis":27},1264428,"吊篮沿钢丝绳由提升机带动向上顺升,不手卷钢丝绳,理论上爬升高度有限制。",[74,75],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":77,"libraryId":5,"type":15,"typeLabel":16,"stem":78,"options":79,"answer":21,"analysis":27},1264429,"施工阶段是控制建设工程项目成本发生的主要阶段。",[80,81],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":21,"analysis":27},1264430,"承包人必须有一套健全的项目财务管理制度,按规定的权限和程序对项目资金的使用和费用的结算支付进行审核、审批,使其成为施工成本控制的一个重要手段。",[86,87],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":89,"libraryId":5,"type":15,"typeLabel":16,"stem":90,"options":91,"answer":21,"analysis":27},1264431,"施工成本考核衡量成本降低的实际成果,并对成本指标完成情况进行总结和评价。",[92,93],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":95,"libraryId":5,"type":15,"typeLabel":16,"stem":96,"options":97,"answer":25,"analysis":27},1264432,"施工成本分析是在施工成本预测的基础上,对成本的形成过程和影响因素进行分析。",[98,99],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":101,"libraryId":5,"type":15,"typeLabel":16,"stem":102,"options":103,"answer":21,"analysis":27},1264433,"完全成本法是把企业生产经营发生的一切费用全部吸收到产品成本之中。",[104,105],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":107,"libraryId":5,"type":15,"typeLabel":16,"stem":108,"options":109,"answer":21,"analysis":27},1264434,"可以说,成本计划是目标成本的一种形式。",[110,111],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":113,"libraryId":5,"type":15,"typeLabel":16,"stem":114,"options":115,"answer":25,"analysis":27},1264435,"合同文件和成本计划是成本控制的目标,进度报告和工程变更与索赔资料是成本控制过程中的静态资料。",[116,117],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":119,"libraryId":5,"type":15,"typeLabel":16,"stem":120,"options":121,"answer":25,"analysis":27},1264436,"建设工程项目施工成本管理应从工程施工开始,直至项目竣工结算完成为止,贯穿于项目实施的全过程。",[122,123],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":125,"libraryId":5,"type":15,"typeLabel":16,"stem":126,"options":127,"answer":21,"analysis":27},1264437,"影响工程成本的因素很多,主要有政策法规性因素、地区性与市场性因素、设计因素、施工因素和人员素质因素等五个方面。",[128,129],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":131,"libraryId":5,"type":15,"typeLabel":16,"stem":132,"options":133,"answer":25,"analysis":27},1264438,"工程成本则是围绕工程而发生的资源耗费的物质体现,包括了生命周期各阶段的资源耗费。",[134,135],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":137,"libraryId":5,"type":15,"typeLabel":16,"stem":138,"options":139,"answer":21,"analysis":27},1264439,"工程造价的直意就是工程的建造所需的费用。",[140,141],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":143,"libraryId":5,"type":15,"typeLabel":16,"stem":144,"options":145,"answer":25,"analysis":27},1264440,"建筑装饰装修工程常见的施工质量缺陷有:脱落、裂、渗、观感效果差等。",[146,147],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":149,"libraryId":5,"type":15,"typeLabel":16,"stem":150,"options":151,"answer":21,"analysis":27},1264441,"特别重大事故,是指造成30人以上死亡,或者100人以上重伤,或者1亿元以上直接经济损失的事故。",[152,153],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":21,"analysis":27},1264442,"施工质量控制点的设置是施工质量计划的重要组成内容,施工质量控制点是施工质量控制的重点对象。",[158,159],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":161,"libraryId":5,"type":15,"typeLabel":16,"stem":162,"options":163,"answer":21,"analysis":27},1264443,"事中质量控制控制的关键是坚持质量标准;控制的重点是工序质量、工作质量和质量控制点的控制。",[164,165],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":167,"libraryId":5,"type":15,"typeLabel":16,"stem":168,"options":169,"answer":21,"analysis":27},1264444,"工序质量控制是施工阶段质量控制的重点。",[170,171],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":173,"libraryId":5,"type":15,"typeLabel":16,"stem":174,"options":175,"answer":21,"analysis":27},1264445,"施工质量检查是施工质量验收的基础。",[176,177],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":21,"analysis":27},1264446,"验收不合格的隐蔽工程,应按验收整改意见进行整改后重新验收。",[182,183],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":25,"analysis":27},1264447,"施工质量控制应贯彻全面、全过程质量管理的思想,运用静态控制原理,进行质量的事前控制、事中控制和事后控制。",[188,189],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":191,"libraryId":5,"type":15,"typeLabel":16,"stem":192,"options":193,"answer":21,"analysis":27},1264448,"建设工程项目质量的影响因素主要是指在建设工程项目质量目标策划、决策和实现过程中影响质量形成的各种客观因素和主观因素。",[194,195],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":197,"libraryId":5,"type":15,"typeLabel":16,"stem":198,"options":199,"answer":25,"analysis":27},1264449,"材料质量控制的内容主要有:材料的质量标准,材料的性能,材料取样,材料质量检查,材料的适用范围和施工要求等。",[200,201],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":203,"libraryId":5,"type":15,"typeLabel":16,"stem":204,"options":205,"answer":21,"analysis":27},1264450,"凡表示不清或认为质量有问题的材料,对质量保证材料有怀疑或与合同规定不符的一般材料,由工程重要程度决定,应进行一定比例试验的材料,需要进行追踪检验,以控制和保证其质量的材料等,均应进行抽检。",[206,207],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":25,"analysis":27},1264451,"建设工程质量的特性主要表现在六个方面:实用性、耐久性、安全性、可靠性、经济性、与环境协调性等。",[212,213],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":215,"libraryId":5,"type":15,"typeLabel":16,"stem":216,"options":217,"answer":21,"analysis":27},1264452,"工程项目形体庞大,高投入,周期长,牵涉面广,具有风险性。",[218,219],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":221,"libraryId":5,"type":15,"typeLabel":16,"stem":222,"options":223,"answer":21,"analysis":27},1264453,"根据国家法律法规的要求,在进行生产安全事故报告和调查处理时,要坚持实事求是、尊重科学原则的态度,及时、准确地查明事故原因,明确事故责任,使责任人受到追究。",[224,225],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":227,"libraryId":5,"type":15,"typeLabel":16,"stem":228,"options":229,"answer":25,"analysis":27},1264454,"施工现场必须按上级要求建立专职消防队,成员应进行消防专业知识培训和教育,做到有备元患。",[230,231],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":233,"libraryId":5,"type":15,"typeLabel":16,"stem":234,"options":235,"answer":21,"analysis":27},1264455,"对易燃物品仓库选址要远离施工人员宿舍及火源存在区域,同时要增加防护设施。",[236,237],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":239,"libraryId":5,"type":15,"typeLabel":16,"stem":240,"options":241,"answer":25,"analysis":27},1264456,"专职电工对现场电气设备每天进行巡查,项目部每月、公司每季对施工用电系统、漏电保护器进行一次全面系统的检查。",[242,243],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":245,"libraryId":5,"type":15,"typeLabel":16,"stem":246,"options":247,"answer":25,"analysis":27},1264457,"配电箱设在干燥通风的场所,周围不得堆放任何妨碍操作、维修的物品,并与被控制的固定设备距离不得超过2m。",[248,249],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":251,"libraryId":5,"type":15,"typeLabel":16,"stem":252,"options":253,"answer":25,"analysis":27},1264458,"高处坠落危险源包括:凡在基准面1.5m(含1.5m)以上作业,建筑物四口五临边、攀登、悬空作业及雨天进行的高处作业,可能导致人身伤害的作业点和工作面。",[254,255],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":25,"analysis":27},1264459,"凡在居民密集区进行强噪声施工作业时,要严格控制施工作业时间,晚间作业不超过20时,早晨作业不早于7时。",[260,261],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":263,"libraryId":5,"type":15,"typeLabel":16,"stem":264,"options":265,"answer":21,"analysis":27},1264460,"除设有符合规定的装置外,不得在施工现场熔融沥青或者焚烧油毡、油漆以及其他会产生有毒有害烟尘和恶臭气体的物质。",[266,267],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":21,"analysis":27},1264461,"通道口设防护棚,防护棚应为不小于5cm厚的木板或两道相距50cm的竹笆。",[272,273],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":275,"libraryId":5,"type":15,"typeLabel":16,"stem":276,"options":277,"answer":25,"analysis":27},1264462,"围挡的高度:市区主要路段不宜低于2.2m;一般路段不低于1.5m。",[278,279],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":21,"analysis":27},1264463,"施工现场安全“五标志”,即:指令标志、禁止标志、警告标志、电力安全标志和提示标志。",[284,285],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":287,"libraryId":5,"type":15,"typeLabel":16,"stem":288,"options":289,"answer":25,"analysis":27},1264464,"施工段是包括一定工作内容的施工过程,是进度计划的基本组成单元。",[290,291],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":293,"libraryId":5,"type":15,"typeLabel":16,"stem":294,"options":295,"answer":21,"analysis":27},1264465,"根据施工图纸、施工方案,确定拟建工程可划分哪些分部分项工程。",[296,297],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":299,"libraryId":5,"type":15,"typeLabel":16,"stem":300,"options":301,"answer":21,"analysis":27},1264466,"流水施工是指所有的施工过程均按一定的时间间隔依次投入施工,各个施工过程陆续开工、陆续竣工,使同一施工过程的施工班组保持连续、均衡施工,不同施工过程尽可能平行搭接施工的组织方式。",[302,303],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},{"id":305,"libraryId":5,"type":15,"typeLabel":16,"stem":306,"options":307,"answer":25,"analysis":27},1264467,"网络计划的表达形式是横道图。",[308,309],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":311,"libraryId":5,"type":15,"typeLabel":16,"stem":312,"options":313,"answer":25,"analysis":27},1264468,"所谓网络图是指由箭头和节点组成的、用来表示工作流程的复杂、无序的网状图形。",[314,315],{"key":20,"text":21,"correct":26},{"key":24,"text":25,"correct":22},{"id":317,"libraryId":5,"type":15,"typeLabel":16,"stem":318,"options":319,"answer":21,"analysis":27},1264469,"建筑装饰装修工程施工进度计划的作用表现在:是控制工程施工进程和工程竣工期限等各项装饰装修工程施工活动的依据。",[320,321],{"key":20,"text":21,"correct":22},{"key":24,"text":25,"correct":26},[323,327,330,333,336,339],{"id":324,"name":325,"category":7,"favorite":326},1,"领导干部任职前廉政法规知识测试题",92,{"id":328,"name":329,"category":7,"favorite":324},595,"建筑结构与设备",{"id":331,"name":332,"category":7,"favorite":324},715,"招标采购专业知识与法律法规",{"id":334,"name":335,"category":7,"favorite":324},848,"市政方向-通用基础",{"id":337,"name":338,"category":7,"favorite":8},534,"BIM工程师",{"id":340,"name":338,"category":7,"favorite":8},535]