[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-851-6":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":692},{"id":5,"name":6,"category":7,"favorite":8},851,"装饰方向-岗位技能","建筑工程",0,6,50,397,[13,38,53,68,82,96,110,125,140,154,169,184,199,213,227,242,252,267,282,296,308,323,337,351,365,379,394,408,423,435,449,463,478,487,501,515,525,539,549,563,577,591,603,617,630,644,658,670,680,686],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":36,"analysis":37},1264370,2,"多选题","影响工程质量的因素有( )。",[19,23,27,30,33],{"key":20,"text":21,"correct":22},"A","人员素质",true,{"key":24,"text":25,"correct":26},"B","管理途径",false,{"key":28,"text":29,"correct":22},"C","机械设备",{"key":31,"text":32,"correct":22},"D","环境条件",{"key":34,"text":35,"correct":22},"E","工程材料","ACDE","",{"id":39,"libraryId":5,"type":15,"typeLabel":16,"stem":40,"options":41,"answer":52,"analysis":37},1264371,"建设工程质量的特性主要表现在",[42,44,46,48,50],{"key":20,"text":43,"correct":26},"特殊性",{"key":24,"text":45,"correct":26},"局限性",{"key":28,"text":47,"correct":26},"隐蔽性",{"key":31,"text":49,"correct":22},"耐久性",{"key":34,"text":51,"correct":22},"经济性","DE",{"id":54,"libraryId":5,"type":15,"typeLabel":16,"stem":55,"options":56,"answer":67,"analysis":37},1264372,"下列属于工程质量管理特点的是( )。",[57,59,61,63,65],{"key":20,"text":58,"correct":22},"工程项目的质量特性较多",{"key":24,"text":60,"correct":22},"工程项目形体庞大,高投入,周期长,牵涉面广,具有风险性",{"key":28,"text":62,"correct":22},"影响工程项目质量的因素多",{"key":31,"text":64,"correct":22},"工程项目质量管理难度较大",{"key":34,"text":66,"correct":26},"工程项目质量具有局限性","ABCD",{"id":69,"libraryId":5,"type":15,"typeLabel":16,"stem":70,"options":71,"answer":67,"analysis":37},1264373,"建设主管部门接到事故报告后,应当依照下列规定上报事故情况,并通知安全生产监督管理部门、公安机关、劳动保障行政主管部门、工会和人民检察院( )。",[72,74,76,78,80],{"key":20,"text":73,"correct":22},"较大事故、重大事故及特别重大事故逐级上报至国务院建设主管部门",{"key":24,"text":75,"correct":22},"一般事故逐级上报至省、自治区、直辖市人民政府建设主管部门",{"key":28,"text":77,"correct":22},"建设主管部门依照本条规定上报事故情况,应当同时报告本级人民政府",{"key":31,"text":79,"correct":22},"国务院建设主管部门接到重大事故和特别重大事故的报告后,应当立即报告国务院,必要时,建设主管部门可以越级上报事故情况",{"key":34,"text":81,"correct":26},"建设主管部门按照上述规定逐级上报事故情况时,每级上报的时间不得超过1h",{"id":83,"libraryId":5,"type":15,"typeLabel":16,"stem":84,"options":85,"answer":67,"analysis":37},1264374,"关于实施事故处理“四不放过”原则,表述正确的是( )。",[86,88,90,92,94],{"key":20,"text":87,"correct":22},"事故原因未查明不放过",{"key":24,"text":89,"correct":22},"事故责任者和员工未受到教育不放过",{"key":28,"text":91,"correct":22},"事故责任者未处理不放过",{"key":31,"text":93,"correct":22},"整改措施未落实不放过",{"key":34,"text":95,"correct":26},"事故单位未处罚不放过",{"id":97,"libraryId":5,"type":15,"typeLabel":16,"stem":98,"options":99,"answer":67,"analysis":37},1264375,"按生产安全事故造成的人员伤亡或直接经济损失,事故一般分为( )。",[100,102,104,106,108],{"key":20,"text":101,"correct":22},"特别重大事故",{"key":24,"text":103,"correct":22},"重大事故",{"key":28,"text":105,"correct":22},"较大事故",{"key":31,"text":107,"correct":22},"一般事故",{"key":34,"text":109,"correct":26},"可忽略事故",{"id":111,"libraryId":5,"type":15,"typeLabel":16,"stem":112,"options":113,"answer":124,"analysis":37},1264376,"建筑装饰工程施工安全事故按伤害程度分类为( )。",[114,116,118,120,122],{"key":20,"text":115,"correct":26},"小伤",{"key":24,"text":117,"correct":22},"轻伤",{"key":28,"text":119,"correct":22},"重伤",{"key":31,"text":121,"correct":22},"死亡",{"key":34,"text":123,"correct":26},"特别重伤","BCD",{"id":126,"libraryId":5,"type":15,"typeLabel":16,"stem":127,"options":128,"answer":139,"analysis":37},1264377,"关于预防中毒事故的防护措施,以下表述正确的是( )。",[129,131,133,135,137],{"key":20,"text":130,"correct":22},"宿舍内严禁存放有毒有害及化学物品",{"key":24,"text":132,"correct":22},"凡从事有毒有害化学物品作业时,作业人员必须佩戴防毒面具,并保证通风良好",{"key":28,"text":134,"correct":22},"现场严禁使用明火照明,以防止煤气中毒事故",{"key":31,"text":136,"correct":26},"进行电焊工作时,不能用自动焊代替手工焊",{"key":34,"text":138,"correct":22},"食堂内严禁非炊事人员进入,炊事人员不能留长指甲,并保持个人卫生清洁,对食堂做到每日清扫","ABCE",{"id":141,"libraryId":5,"type":15,"typeLabel":16,"stem":142,"options":143,"answer":67,"analysis":37},1264378,"关于施工现场防火措施,以下表述正确的是( )。",[144,146,148,150,152],{"key":20,"text":145,"correct":22},"对于临时线路要加强管理和检查,防止因产生电火花造成火灾",{"key":24,"text":147,"correct":22},"临时用房、仓库必须留出足量的消防通道,以备应急之用",{"key":28,"text":149,"correct":22},"对易燃物品仓库选址要远离施工人员宿舍及火源存在区域,同时要增加防护设施",{"key":31,"text":151,"correct":22},"配备足量的消防器材、用具和水源,并保证其常备有效,做到防患于未然",{"key":34,"text":153,"correct":26},"施工现场必须按上级要求建立专职消防队,成员应进行消防专业知识培训和教育,做到有备无患",{"id":155,"libraryId":5,"type":15,"typeLabel":16,"stem":156,"options":157,"answer":168,"analysis":37},1264379,"关于预防触电事故的防护措施,以下表述正确的是( )。",[158,160,162,164,166],{"key":20,"text":159,"correct":26},"专职电工对现场电气设备每天进行巡查,项目部每月、公司每季对施工用电系统、漏电保护器进行一次全面系统的检查",{"key":24,"text":161,"correct":22},"在建工程外侧与外电高压线路未达到安全距离应增设屏障遮栏、围栏或保护网等防护",{"key":28,"text":163,"correct":22},"必须由持有上岗证件的专职电工,负责现场临时用电的管理及安拆",{"key":31,"text":165,"correct":22},"凡从事与用电有关的施工作业时,必须实行电工跟班作业",{"key":34,"text":167,"correct":22},"使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品","BCDE",{"id":170,"libraryId":5,"type":15,"typeLabel":16,"stem":171,"options":172,"answer":183,"analysis":37},1264380,"下列关于预防高处坠落事故的防护措施表述正确的是( )。",[173,175,177,179,181],{"key":20,"text":174,"correct":22},"为防止高处坠落事故的发生,在工程施工前对所从事高处作业的人员进行安全基本知识、安全注意事项等安全技术交底",{"key":24,"text":176,"correct":22},"凡患有高血压、心脏病及不宜高处作业的人员,严禁参加高处作业工作",{"key":28,"text":178,"correct":26},"对所有预留洞口,必须加木盖进行防护,凡超过1000mm的洞口应在上方铺设厚度不小于40mm的模板,并在下方支挂安全网",{"key":31,"text":180,"correct":26},"对所有临边,如悬挑临边可用预留的钢筋按规定绑扎严密,施工梯和进料便道临边加防护栏杆,上栏杆在1.2m处,下栏杆在0.6m处各设一道,栏杆间距不大于1.5m,并在0.15m处加挡脚手栏杆",{"key":34,"text":182,"correct":22},"施工作业人员进场后,按不同层次（项目部、施工队、班组）进行三级教育工作","ABE",{"id":185,"libraryId":5,"type":15,"typeLabel":16,"stem":186,"options":187,"answer":198,"analysis":37},1264381,"根据环境科学理论,可将固体废物的治理防腐概括为( )。",[188,190,192,194,196],{"key":20,"text":189,"correct":26},"填埋化",{"key":24,"text":191,"correct":22},"无害化",{"key":28,"text":193,"correct":22},"减量化",{"key":31,"text":195,"correct":26},"膨胀化",{"key":34,"text":197,"correct":22},"安定化","BCE",{"id":200,"libraryId":5,"type":15,"typeLabel":16,"stem":201,"options":202,"answer":67,"analysis":37},1264382,"施工现场事故的处理包括( )。",[203,205,207,209,211],{"key":20,"text":204,"correct":22},"施工现场水污染的处理",{"key":24,"text":206,"correct":22},"施工现场噪声污染的处理",{"key":28,"text":208,"correct":22},"施工现场空气污染的处理",{"key":31,"text":210,"correct":22},"施工现场固体废物的处理",{"key":34,"text":212,"correct":26},"施工现场有害气体的处理",{"id":214,"libraryId":5,"type":15,"typeLabel":16,"stem":215,"options":216,"answer":124,"analysis":37},1264383,"关于施工现场环境保护的措施.以下正确的是( ):",[217,219,221,223,225],{"key":20,"text":218,"correct":26},"妥善处理泥浆水.直接排人域市排污设的",{"key":24,"text":220,"correct":22},"除设有符合规定的装置外,不得在施工现场熔融沥青或者焚烧油毡、油漆以及其他会产生有毒有害烟尘和恶臭气体的物质",{"key":28,"text":222,"correct":22},"使用密封式的圆筒或者采用气体措处理高空废弃物",{"key":31,"text":224,"correct":22},"采取有效措施控制施工过程中的扬尘",{"key":34,"text":226,"correct":26},"将有毒有害废弃物用作土方回填,减轻对空气环境的污染",{"id":228,"libraryId":5,"type":15,"typeLabel":16,"stem":229,"options":230,"answer":241,"analysis":37},1264384,"检查和调整施工进度计划不包括哪些方面( )。",[231,233,235,237,239],{"key":20,"text":232,"correct":26},"施工工期的检查与调整",{"key":24,"text":234,"correct":22},"施工方案的检查与调整",{"key":28,"text":236,"correct":26},"施工顺序的检查与调整",{"key":31,"text":238,"correct":26},"资源均衡性的检查与调整",{"key":34,"text":240,"correct":22},"施工组织的检查与调整","BE",{"id":243,"libraryId":5,"type":15,"typeLabel":16,"stem":244,"options":245,"answer":251,"analysis":37},1264385,"检查和调整施工进度计划包括哪些方面( )。",[246,247,248,249,250],{"key":20,"text":232,"correct":22},{"key":24,"text":234,"correct":26},{"key":28,"text":236,"correct":22},{"key":31,"text":238,"correct":22},{"key":34,"text":240,"correct":26},"ACD",{"id":253,"libraryId":5,"type":15,"typeLabel":16,"stem":254,"options":255,"answer":266,"analysis":37},1264386,"网络图中,按节点和箭线所代表的含义不同,可分为( )。",[256,258,260,262,264],{"key":20,"text":257,"correct":22},"单代号网络图",{"key":24,"text":259,"correct":22},"双代号网络图",{"key":28,"text":261,"correct":26},"横道图",{"key":31,"text":263,"correct":26},"单箭头网络图",{"key":34,"text":265,"correct":26},"双箭头网络图","AB",{"id":268,"libraryId":5,"type":15,"typeLabel":16,"stem":269,"options":270,"answer":281,"analysis":37},1264387,"建筑装饰装修工程施工进度计划的作用表现在( )。",[271,273,275,277,279],{"key":20,"text":272,"correct":22},"是控制工程施工进程和工程竣工期限等各项装饰装修工程施工活动的依据",{"key":24,"text":274,"correct":22},"确定装饰装修工程各个工序的施工顺序及需要的施工持续时间",{"key":28,"text":276,"correct":22},"组织协调各个工序之间的衔接、穿插、平行搭接、协作配合等关系",{"key":31,"text":278,"correct":22},"指导现场施工安排,控制施工进度和确保施工任务的按期完成",{"key":34,"text":280,"correct":22},"为制订各项资源需用量计划和编制施工准备工作计划提供依据","ABCDE",{"id":283,"libraryId":5,"type":15,"typeLabel":16,"stem":284,"options":285,"answer":124,"analysis":37},1264388,"控制性施工进度计划主要适用于( )的工程,同时还适用于虽然工程规模不大、结构不算复杂,但各种资源没有落实,或者由于装饰设计的部位、材料等可能发生变化以及其他各种情况。",[286,288,290,292,294],{"key":20,"text":287,"correct":26},"任务具体明确",{"key":24,"text":289,"correct":22},"结构较复杂",{"key":28,"text":291,"correct":22},"规模较大",{"key":31,"text":293,"correct":22},"工期较长需跨年度施工",{"key":34,"text":295,"correct":26},"施工工期不太长",{"id":297,"libraryId":5,"type":15,"typeLabel":16,"stem":298,"options":299,"answer":307,"analysis":37},1264389,"指导性施工进度计划适用于( )的工程。",[300,301,303,304,306],{"key":20,"text":287,"correct":22},{"key":24,"text":302,"correct":22},"施工条件基本落实",{"key":28,"text":289,"correct":26},{"key":31,"text":305,"correct":22},"各项资源供应正常",{"key":34,"text":295,"correct":22},"ABDE",{"id":309,"libraryId":5,"type":15,"typeLabel":16,"stem":310,"options":311,"answer":322,"analysis":37},1264390,"施工进度计划根据施工项目划分的粗细程度可分为( )。",[312,314,316,318,320],{"key":20,"text":313,"correct":26},"年进度计划",{"key":24,"text":315,"correct":22},"控制性施工进度计划",{"key":28,"text":317,"correct":26},"季进度计划",{"key":31,"text":319,"correct":22},"指导性施工进度计划",{"key":34,"text":321,"correct":26},"月进度计划","BD",{"id":324,"libraryId":5,"type":15,"typeLabel":16,"stem":325,"options":326,"answer":281,"analysis":37},1264391,"室内电气系统金属线槽敷设及其配线工程施工验收标准一般项目有( )。",[327,329,331,333,335],{"key":20,"text":328,"correct":22},"线槽应安装牢固,无扭曲变形,紧固件的螺母应在线槽外侧",{"key":24,"text":330,"correct":22},"线槽在建筑物变形缝处,应设补偿装置",{"key":28,"text":332,"correct":22},"当采用多相供电时,同一建筑物、构筑物的电线绝缘层颜色选择应一致,即保护地线（PE线）应是黄绿相间色,零线用淡蓝色;相线用:A相～黄色、B相～绿色、C～相红色",{"key":31,"text":334,"correct":22},"线槽应紧贴建筑物表面,固定牢靠,横平竖直,布置合理,盖板无翘角,接口严密整齐",{"key":34,"text":336,"correct":22},"线槽水平或垂直敷设时的平直度和垂直度允许偏差不应超过全长的5%",{"id":338,"libraryId":5,"type":15,"typeLabel":16,"stem":339,"options":340,"answer":281,"analysis":37},1264392,"混凝土、水泥砂浆整体楼地面面层施工步骤有( )。",[341,343,345,347,349],{"key":20,"text":342,"correct":22},"搅拌",{"key":24,"text":344,"correct":22},"基底处理",{"key":28,"text":346,"correct":22},"浇筑",{"key":31,"text":348,"correct":22},"压实",{"key":34,"text":350,"correct":22},"养护",{"id":352,"libraryId":5,"type":15,"typeLabel":16,"stem":353,"options":354,"answer":67,"analysis":37},1264393,"软包施工验收主控项目有( )。",[355,357,359,361,363],{"key":20,"text":356,"correct":22},"软包面料、内衬材料及边框的材质、颜色、图案、燃烧性能等级和木材的含水率应符合设计要求及国家现行标准的有关规定",{"key":24,"text":358,"correct":22},"软包工程的安装位置及构造做法应符合设计要求",{"key":28,"text":360,"correct":22},"软包工程的龙骨、衬板、边框应安装牢固,无翘曲,拼缝应平直",{"key":31,"text":362,"correct":22},"单块软包面料不应有接缝,四周应绷压严密",{"key":34,"text":364,"correct":26},"软包工程表面应平整、洁净,无凹凸不平及皱折;图案应清晰、无色差,整体应协调美观",{"id":366,"libraryId":5,"type":15,"typeLabel":16,"stem":367,"options":368,"answer":67,"analysis":37},1264394,"下列属于外墙面砖施工验收主控项目的有( )。",[369,371,373,375,377],{"key":20,"text":370,"correct":22},"饰面砖的品种、规格、颜色和性能应符合设计要求",{"key":24,"text":372,"correct":22},"饰面砖粘贴工程的找平、防水、粘结和勾缝材料及施工方法应符合设计要求及国家现行产品标准和工程技术标准的规定",{"key":28,"text":374,"correct":22},"饰面砖粘贴必须牢固",{"key":31,"text":376,"correct":22},"满粘法施工的饰面砖工程应无空鼓、裂缝",{"key":34,"text":378,"correct":26},"饰面砖表面应平整、洁净、色泽一致,无裂痕和缺损",{"id":380,"libraryId":5,"type":15,"typeLabel":16,"stem":381,"options":382,"answer":393,"analysis":37},1264395,"轻钢龙骨隔断施工,纸面石膏板接缝做法有( )。",[383,385,387,389,391],{"key":20,"text":384,"correct":22},"平缝",{"key":24,"text":386,"correct":22},"凹缝",{"key":28,"text":388,"correct":22},"压条缝",{"key":31,"text":390,"correct":26},"焊接",{"key":34,"text":392,"correct":26},"机械连接","ABC",{"id":395,"libraryId":5,"type":15,"typeLabel":16,"stem":396,"options":397,"answer":393,"analysis":37},1264396,"抹灰工程验收中,属于主控项目的有( )。",[398,400,402,404,406],{"key":20,"text":399,"correct":22},"抹灰前基层表面的尘土、污垢、油渍等应清除干净,并应洒水润湿",{"key":24,"text":401,"correct":22},"一般抹灰所用材料的品种和性能应符合设计要求。水泥的凝结时间和安定性复验应合格。砂浆的配合比应符合设计要求",{"key":28,"text":403,"correct":22},"抹灰层与基层之间及各抹灰层之间必须粘结牢固,抹灰层应无脱层、空鼓,面层应无爆灰和裂缝",{"key":31,"text":405,"correct":26},"普通抹灰表面应光滑、洁净、接槎平整,分格缝应清晰",{"key":34,"text":407,"correct":26},"高级抹灰表面应光滑、洁净、颜色均匀、无抹纹,分格缝和灰线应清晰美观",{"id":409,"libraryId":5,"type":15,"typeLabel":16,"stem":410,"options":411,"answer":422,"analysis":37},1264397,"技术交底分为( )。",[412,414,416,418,420],{"key":20,"text":413,"correct":22},"口头交底",{"key":24,"text":415,"correct":26},"设计变更交底",{"key":28,"text":417,"correct":22},"书面交底",{"key":31,"text":419,"correct":26},"施工组织设计交底",{"key":34,"text":421,"correct":22},"样板交底","ACE",{"id":424,"libraryId":5,"type":15,"typeLabel":16,"stem":425,"options":426,"answer":36,"analysis":37},1264398,"技术交底的内容包括( )。",[427,429,431,432,433],{"key":20,"text":428,"correct":22},"图纸交底",{"key":24,"text":430,"correct":26},"安全交底",{"key":28,"text":419,"correct":22},{"key":31,"text":415,"correct":22},{"key":34,"text":434,"correct":22},"分项工程技术交底",{"id":436,"libraryId":5,"type":15,"typeLabel":16,"stem":437,"options":438,"answer":322,"analysis":37},1264399,"室内装饰装修工程,施工顺序应根据具体条件来确定,基本原则不包括( )。",[439,441,443,445,447],{"key":20,"text":440,"correct":26},"先湿作业、后干作业",{"key":24,"text":442,"correct":22},"先下后上",{"key":28,"text":444,"correct":26},"先墙顶、后地面",{"key":31,"text":446,"correct":22},"先外后内",{"key":34,"text":448,"correct":26},"先管线、后饰面",{"id":450,"libraryId":5,"type":15,"typeLabel":16,"stem":451,"options":452,"answer":393,"analysis":37},1264400,"确定施工流程时,根据工程各部位的繁简程度,哪些部位应优先施工( )。",[453,455,457,459,461],{"key":20,"text":454,"correct":22},"技术复杂",{"key":24,"text":456,"correct":22},"施工进度较慢",{"key":28,"text":458,"correct":22},"工期较长",{"key":31,"text":460,"correct":26},"体形复杂",{"key":34,"text":462,"correct":26},"技术简单",{"id":464,"libraryId":5,"type":15,"typeLabel":16,"stem":465,"options":466,"answer":477,"analysis":37},1264401,"建筑装饰工程的施工程序的一般程序不包括( )。",[467,469,471,473,475],{"key":20,"text":468,"correct":26},"先室外后室内",{"key":24,"text":470,"correct":26},"先室内后室外",{"key":28,"text":472,"correct":22},"先上后下",{"key":31,"text":474,"correct":26},"室内外同时进行",{"key":34,"text":476,"correct":22},"上下同时进行","CE",{"id":479,"libraryId":5,"type":15,"typeLabel":16,"stem":480,"options":481,"answer":422,"analysis":37},1264402,"室内装饰装修工程,施工顺序应根据具体条件来确定,基本原则有( )。",[482,483,484,485,486],{"key":20,"text":440,"correct":22},{"key":24,"text":442,"correct":26},{"key":28,"text":444,"correct":22},{"key":31,"text":446,"correct":26},{"key":34,"text":448,"correct":22},{"id":488,"libraryId":5,"type":15,"typeLabel":16,"stem":489,"options":490,"answer":281,"analysis":37},1264403,"确定施工顺序的基本原则有( )。",[491,493,495,497,499],{"key":20,"text":492,"correct":22},"符合施工工艺的要求",{"key":24,"text":494,"correct":22},"房间的使用功能和施工方法要协调一致",{"key":28,"text":496,"correct":22},"考虑施工组织的要求",{"key":31,"text":498,"correct":22},"考虑施工的安全因素",{"key":34,"text":500,"correct":22},"考虑气候条件",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":281,"analysis":37},1264404,"确定施工流程时,一般应考虑以下哪些因素( )。",[505,507,509,511,513],{"key":20,"text":506,"correct":22},"施工方法",{"key":24,"text":508,"correct":22},"工程各部位的繁简程度",{"key":28,"text":510,"correct":22},"选用的材料",{"key":31,"text":512,"correct":22},"用户对生产和使用的需要",{"key":34,"text":514,"correct":22},"设备管道的布置系统",{"id":516,"libraryId":5,"type":15,"typeLabel":16,"stem":517,"options":518,"answer":524,"analysis":37},1264405,"建筑装饰工程的施工程序一般有( )。",[519,520,521,522,523],{"key":20,"text":468,"correct":22},{"key":24,"text":470,"correct":22},{"key":28,"text":472,"correct":26},{"key":31,"text":474,"correct":22},{"key":34,"text":476,"correct":26},"ABD",{"id":526,"libraryId":5,"type":15,"typeLabel":16,"stem":527,"options":528,"answer":183,"analysis":37},1264406,"不属于建筑装饰装修工程施工的有( )。",[529,531,533,535,537],{"key":20,"text":530,"correct":22},"设备工程",{"key":24,"text":532,"correct":22},"主体工程",{"key":28,"text":534,"correct":26},"楼地面工程",{"key":31,"text":536,"correct":26},"门窗工程",{"key":34,"text":538,"correct":22},"基础工程",{"id":540,"libraryId":5,"type":15,"typeLabel":16,"stem":541,"options":542,"answer":393,"analysis":37},1264407,"属于建筑装饰装修工程施工的有( )。",[543,545,546,547,548],{"key":20,"text":544,"correct":22},"墙面装饰",{"key":24,"text":536,"correct":22},{"key":28,"text":534,"correct":22},{"key":31,"text":532,"correct":26},{"key":34,"text":538,"correct":26},{"id":550,"libraryId":5,"type":15,"typeLabel":16,"stem":551,"options":552,"answer":281,"analysis":37},1264408,"单位工程装饰装修工程施工组织设计的内容一般应包括( )。",[553,555,557,559,561],{"key":20,"text":554,"correct":22},"工程概况",{"key":24,"text":556,"correct":22},"旄工方案",{"key":28,"text":558,"correct":22},"施工进度计划",{"key":31,"text":560,"correct":22},"施工准备工作及各项资源需要量计划",{"key":34,"text":562,"correct":22},"施工平面图",{"id":564,"libraryId":5,"type":15,"typeLabel":16,"stem":565,"options":566,"answer":393,"analysis":37},1264409,"下列属于强制性标准监督检查的内容的是( )。",[567,569,571,573,575],{"key":20,"text":568,"correct":22},"有关工程技术人员是否熟悉、掌握强制性标准",{"key":24,"text":570,"correct":22},"T程项目的规划、勘察、设计、施工、验收等是否符合强制性标准的规定",{"key":28,"text":572,"correct":22},"工程项目采用的材料、设备是否符合强制性标准的规定",{"key":31,"text":574,"correct":26},"工程施工管理方法是否符合强制性标准的规定",{"key":34,"text":576,"correct":26},"工程施工设备是否符合强制性标准的规定",{"id":578,"libraryId":5,"type":15,"typeLabel":16,"stem":579,"options":580,"answer":168,"analysis":37},1264410,"施工安全保证措施包括( )。",[581,583,585,587,589],{"key":20,"text":582,"correct":26},"安全意识",{"key":24,"text":584,"correct":22},"技术措施",{"key":28,"text":586,"correct":22},"组织保障",{"key":31,"text":588,"correct":22},"应急预案",{"key":34,"text":590,"correct":22},"预测监控",{"id":592,"libraryId":5,"type":15,"typeLabel":16,"stem":593,"options":594,"answer":67,"analysis":37},1264411,"施工工艺技术包括( )。",[595,597,599,600,602],{"key":20,"text":596,"correct":22},"技术参数",{"key":24,"text":598,"correct":22},"工艺流程",{"key":28,"text":506,"correct":22},{"key":31,"text":601,"correct":22},"检查验收",{"key":34,"text":558,"correct":26},{"id":604,"libraryId":5,"type":15,"typeLabel":16,"stem":605,"options":606,"answer":139,"analysis":37},1264412,"工程概况包括( )。",[607,609,611,613,615],{"key":20,"text":608,"correct":22},"危险性较大的分部分项工程概况",{"key":24,"text":610,"correct":22},"施工平面布置",{"key":28,"text":612,"correct":22},"施工要求",{"key":31,"text":614,"correct":26},"施工计划",{"key":34,"text":616,"correct":22},"施工技术保证条件",{"id":618,"libraryId":5,"type":15,"typeLabel":16,"stem":619,"options":620,"answer":139,"analysis":37},1264413,"下列属于专项方案编制内容的是( )。",[621,622,624,626,628],{"key":20,"text":554,"correct":22},{"key":24,"text":623,"correct":22},"编制依据",{"key":28,"text":625,"correct":22},"施工工艺技术",{"key":31,"text":627,"correct":26},"施工管理方法",{"key":34,"text":629,"correct":22},"劳动力计划",{"id":631,"libraryId":5,"type":15,"typeLabel":16,"stem":632,"options":633,"answer":524,"analysis":37},1264414,"下列关于三级资质标准表述正确的是( )。",[634,636,638,640,642],{"key":20,"text":635,"correct":22},"企业近3年承担过3项以上单位工程造价20万元以上的装修装饰工程",{"key":24,"text":637,"correct":22},"企业经理具有5年以上从事工程管理工作经历",{"key":28,"text":639,"correct":26},"企业具有的三级资质以上项目经理不少于5人",{"key":31,"text":641,"correct":22},"工程技术人员中,具有中级以上职称的人员不少于2人",{"key":34,"text":643,"correct":26},"企业近3年最高年工程结算收入500万元以上",{"id":645,"libraryId":5,"type":15,"typeLabel":16,"stem":646,"options":647,"answer":36,"analysis":37},1264415,"下列关于二级资质标准表述正确的是( )。",[648,650,652,654,656],{"key":20,"text":649,"correct":22},"企业近5年承担过2项以上单位工程造价500万元以上的装修装饰工程",{"key":24,"text":651,"correct":26},"企业经理具有5年以上从事工程管理工作经历或具有高级职称",{"key":28,"text":653,"correct":22},"企业具有的二级资质以上项目经理不少于5人",{"key":31,"text":655,"correct":22},"工程技术人员中,具有中级以上职称的人员不少于5人",{"key":34,"text":657,"correct":22},"企业近3年最高年工程结算收入1000万元以上",{"id":659,"libraryId":5,"type":15,"typeLabel":16,"stem":660,"options":661,"answer":251,"analysis":37},1264416,"下列关于一级资质标准表述正确的是( )。",[662,664,665,667,669],{"key":20,"text":663,"correct":22},"企业近5年承担过3项以上单位工程造价1000万元以上或三星级以上宾馆大堂的装修装饰工程施工,工程质量合格",{"key":24,"text":651,"correct":26},{"key":28,"text":666,"correct":22},"总会计师具有中级以上会计职称",{"key":31,"text":668,"correct":22},"工程技术人员中,具有中级以上职称的人员不少于10人",{"key":34,"text":657,"correct":26},{"id":671,"libraryId":5,"type":672,"typeLabel":673,"stem":674,"options":675,"answer":677,"analysis":37},1264417,3,"判断题","重大事故,是指造成10人以上30人以下死亡,或者50人以上100人以下重伤,或者5000万元以上1亿元以下直接经济损失的事故;",[676,678],{"key":20,"text":677,"correct":22},"正确",{"key":24,"text":679,"correct":26},"错误",{"id":681,"libraryId":5,"type":672,"typeLabel":673,"stem":682,"options":683,"answer":679,"analysis":37},1264418,"仪器可产生五个激光平面（一个水平面和四个正交铅垂面,投射到墙上产生激光线）和一个激光下对点。两个垂直面在天顶不相交。",[684,685],{"key":20,"text":677,"correct":26},{"key":24,"text":679,"correct":22},{"id":687,"libraryId":5,"type":672,"typeLabel":673,"stem":688,"options":689,"answer":677,"analysis":37},1264419,"激光经纬仪在光学经纬仪上引入半导体激光,通过望眼镜发射出来。",[690,691],{"key":20,"text":677,"correct":22},{"key":24,"text":679,"correct":26},[693,697,700,703,706,709],{"id":694,"name":695,"category":7,"favorite":696},1,"领导干部任职前廉政法规知识测试题",92,{"id":698,"name":699,"category":7,"favorite":694},595,"建筑结构与设备",{"id":701,"name":702,"category":7,"favorite":694},715,"招标采购专业知识与法律法规",{"id":704,"name":705,"category":7,"favorite":694},848,"市政方向-通用基础",{"id":707,"name":708,"category":7,"favorite":8},534,"BIM工程师",{"id":710,"name":708,"category":7,"favorite":8},535]