[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-851-3":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":558},{"id":5,"name":6,"category":7,"favorite":8},851,"装饰方向-岗位技能","建筑工程",0,3,50,397,[13,34,43,55,67,77,89,101,113,121,133,143,152,161,170,178,187,198,208,217,229,239,247,256,268,280,289,301,313,321,329,340,352,364,376,388,397,405,417,429,441,453,465,477,489,501,511,523,535,546],{"id":14,"libraryId":5,"type":15,"typeLabel":16,"stem":17,"options":18,"answer":27,"analysis":33},1264220,1,"单选题","裱糊工程基体或基层的含水率:混凝土和抹灰不得大于( )。",[19,23,26,30],{"key":20,"text":21,"correct":22},"A","10%",false,{"key":24,"text":25,"correct":22},"B","15%",{"key":27,"text":28,"correct":29},"C","8%",true,{"key":31,"text":32,"correct":22},"D","12%","",{"id":35,"libraryId":5,"type":15,"typeLabel":16,"stem":36,"options":37,"answer":27,"analysis":33},1264221,"混凝土及抹灰面溶剂型涂料的施工中,基层干燥,含水率不大于( )。",[38,39,40,41],{"key":20,"text":25,"correct":22},{"key":24,"text":21,"correct":22},{"key":27,"text":28,"correct":29},{"key":31,"text":42,"correct":22},"6%",{"id":44,"libraryId":5,"type":15,"typeLabel":16,"stem":45,"options":46,"answer":24,"analysis":33},1264222,"混凝土及抹灰面溶剂型涂料的施工中,作业环境温度不低于10℃,相对湿度不宜大于( )。",[47,49,51,53],{"key":20,"text":48,"correct":22},"50%",{"key":24,"text":50,"correct":29},"60%",{"key":27,"text":52,"correct":22},"75%",{"key":31,"text":54,"correct":22},"85%",{"id":56,"libraryId":5,"type":15,"typeLabel":16,"stem":57,"options":58,"answer":31,"analysis":33},1264223,"石材钻孔时,将已编好号的饰面板放在操作支架上,用钻在板材上、下两个侧边上钻孔。通常每个侧边打两个孔,当板材宽度较大时,应增加孔数,孔间距应不大于( )mm。",[59,61,63,65],{"key":20,"text":60,"correct":22},"300",{"key":24,"text":62,"correct":22},"400",{"key":27,"text":64,"correct":22},"000",{"key":31,"text":66,"correct":29},"600",{"id":68,"libraryId":5,"type":15,"typeLabel":16,"stem":69,"options":70,"answer":20,"analysis":33},1264224,"外墙贴面砖工程的施工验收中,室外每个检验批每( )rri2应至少抽查一处,每处不得小于10平方米。",[71,73,75,76],{"key":20,"text":72,"correct":29},"100",{"key":24,"text":74,"correct":22},"200",{"key":27,"text":60,"correct":22},{"key":31,"text":62,"correct":22},{"id":78,"libraryId":5,"type":15,"typeLabel":16,"stem":79,"options":80,"answer":20,"analysis":33},1264225,"外墙贴面砖工程的施工验收中,检验批划分,相同材料、工艺和施工条件的室外饰面板（砖）工程每( )m2应划分为一个检验批,不足500m2也应划分为一个检验批。",[81,83,85,87],{"key":20,"text":82,"correct":29},"500～1000",{"key":24,"text":84,"correct":22},"600～1200",{"key":27,"text":86,"correct":22},"1000",{"key":31,"text":88,"correct":22},"1200",{"id":90,"libraryId":5,"type":15,"typeLabel":16,"stem":91,"options":92,"answer":24,"analysis":33},1264226,"外墙贴面砖工程的施工中,石灰膏一般熟化时间不应小于( )d。",[93,95,97,99],{"key":20,"text":94,"correct":22},"20",{"key":24,"text":96,"correct":29},"15",{"key":27,"text":98,"correct":22},"10",{"key":31,"text":100,"correct":22},"30",{"id":102,"libraryId":5,"type":15,"typeLabel":16,"stem":103,"options":104,"answer":27,"analysis":33},1264227,"外墙贴面砖工程的施工中,用面砖做灰饼,找出墙面、柱面、门窗套等横竖标准,阳角处要双面排直,灰饼间距不应大于( )m。",[105,107,109,111],{"key":20,"text":106,"correct":22},"2",{"key":24,"text":108,"correct":22},"3",{"key":27,"text":110,"correct":29},"1.5",{"key":31,"text":112,"correct":22},"2.5",{"id":114,"libraryId":5,"type":15,"typeLabel":16,"stem":115,"options":116,"answer":31,"analysis":33},1264228,"外墙贴面砖工程的施工中,石灰膏用于罩面灰,熟化时间不应小于( )d。",[117,118,119,120],{"key":20,"text":94,"correct":22},{"key":24,"text":96,"correct":22},{"key":27,"text":98,"correct":22},{"key":31,"text":100,"correct":29},{"id":122,"libraryId":5,"type":15,"typeLabel":16,"stem":123,"options":124,"answer":24,"analysis":33},1264229,"外墙贴面砖工程的施工程序为( )。",[125,127,129,131],{"key":20,"text":126,"correct":22},"抹底子灰→排砖、弹线分格→选砖、浸砖→镶贴面砖→擦缝",{"key":24,"text":128,"correct":29},"基层处理、抹底子灰→排砖、弹线分格→选砖、浸砖→镶贴面砖→擦缝",{"key":27,"text":130,"correct":22},"基层处理、抹底子灰→选砖、浸砖→镶贴面砖→擦缝",{"key":31,"text":132,"correct":22},"基层处理、抹底子灰→排砖、弹线分格→镶贴面砖→擦缝",{"id":134,"libraryId":5,"type":15,"typeLabel":16,"stem":135,"options":136,"answer":24,"analysis":33},1264230,"骨架隔墙工程的检查数量应符合下列规定:每个检验批应至少抽查( ),并不得少于3间;不足3间时应全数检查。",[137,139,140,141],{"key":20,"text":138,"correct":22},"20%",{"key":24,"text":21,"correct":29},{"key":27,"text":25,"correct":22},{"key":31,"text":142,"correct":22},"30%",{"id":144,"libraryId":5,"type":15,"typeLabel":16,"stem":145,"options":146,"answer":20,"analysis":33},1264231,"轻钢龙骨隔断施工,、石膏板一般用自攻螺钉固定,板边钉距为( )mm。",[147,148,150,151],{"key":20,"text":74,"correct":29},{"key":24,"text":149,"correct":22},"250",{"key":27,"text":60,"correct":22},{"key":31,"text":62,"correct":22},{"id":153,"libraryId":5,"type":15,"typeLabel":16,"stem":154,"options":155,"answer":27,"analysis":33},1264232,"板材隔墙安装的允许偏差,立面垂直度,石膏空心板为( )mm。",[156,158,159,160],{"key":20,"text":157,"correct":22},"5",{"key":24,"text":106,"correct":22},{"key":27,"text":108,"correct":29},{"key":31,"text":96,"correct":22},{"id":162,"libraryId":5,"type":15,"typeLabel":16,"stem":163,"options":164,"answer":31,"analysis":33},1264233,"条板隔墙的门、窗框的安装应在条板隔墙安装完成( )d后进行。",[165,166,167,168],{"key":20,"text":108,"correct":22},{"key":24,"text":157,"correct":22},{"key":27,"text":98,"correct":22},{"key":31,"text":169,"correct":29},"7",{"id":171,"libraryId":5,"type":15,"typeLabel":16,"stem":172,"options":173,"answer":20,"analysis":33},1264234,"板材隔墙工程的检查数量应每个检验批至少抽查( ),并不得少于3间。",[174,175,176,177],{"key":20,"text":21,"correct":29},{"key":24,"text":25,"correct":22},{"key":27,"text":138,"correct":22},{"key":31,"text":142,"correct":22},{"id":179,"libraryId":5,"type":15,"typeLabel":16,"stem":180,"options":181,"answer":27,"analysis":33},1264235,"石膏板、钙塑板安装。当采用钉固法安装时,螺钉至板边距离不得小于( )mm。",[182,183,184,185],{"key":20,"text":100,"correct":22},{"key":24,"text":98,"correct":22},{"key":27,"text":96,"correct":29},{"key":31,"text":186,"correct":22},"50",{"id":188,"libraryId":5,"type":15,"typeLabel":16,"stem":189,"options":190,"answer":27,"analysis":33},1264236,"上人吊顶一般采用uc50中龙骨,吊点间距( )mm。",[191,193,194,196],{"key":20,"text":192,"correct":22},"800",{"key":24,"text":86,"correct":22},{"key":27,"text":195,"correct":29},"900～1200",{"key":31,"text":197,"correct":22},"1000～1500",{"id":199,"libraryId":5,"type":15,"typeLabel":16,"stem":200,"options":201,"answer":27,"analysis":33},1264237,"主龙骨应从吊顶中心向两边分,最大间距为( )mm。",[202,203,205,206],{"key":20,"text":192,"correct":22},{"key":24,"text":204,"correct":22},"900",{"key":27,"text":86,"correct":29},{"key":31,"text":207,"correct":22},"1100",{"id":209,"libraryId":5,"type":15,"typeLabel":16,"stem":210,"options":211,"answer":24,"analysis":33},1264238,"吊杆距主龙骨端部的距离不得大于( )mm。",[212,213,214,216],{"key":20,"text":62,"correct":22},{"key":24,"text":60,"correct":29},{"key":27,"text":215,"correct":22},"450",{"key":31,"text":66,"correct":22},{"id":218,"libraryId":5,"type":15,"typeLabel":16,"stem":219,"options":220,"answer":24,"analysis":33},1264239,"人造木板应对哪种性能指标进行复验( )。",[221,223,225,227],{"key":20,"text":222,"correct":22},"耐热性",{"key":24,"text":224,"correct":29},"甲醛含量",{"key":27,"text":226,"correct":22},"抗冻性",{"key":31,"text":228,"correct":22},"强度",{"id":230,"libraryId":5,"type":15,"typeLabel":16,"stem":231,"options":232,"answer":24,"analysis":33},1264240,"抹灰工程应分层进行。当抹灰总厚度大于或等于( )mm时,应采取加强措施。",[233,234,236,237],{"key":20,"text":94,"correct":22},{"key":24,"text":235,"correct":29},"35",{"key":27,"text":98,"correct":22},{"key":31,"text":238,"correct":22},"40",{"id":240,"libraryId":5,"type":15,"typeLabel":16,"stem":241,"options":242,"answer":27,"analysis":33},1264241,"抹灰工程中,加气混凝土砌块、混凝土空心砌块墙体双面满铺钢丝网,并与梁、柱、剪力墙界面搭接宽( )mm。",[243,244,245,246],{"key":20,"text":74,"correct":22},{"key":24,"text":60,"correct":22},{"key":27,"text":72,"correct":29},{"key":31,"text":149,"correct":22},{"id":248,"libraryId":5,"type":15,"typeLabel":16,"stem":249,"options":250,"answer":24,"analysis":33},1264242,"抹灰工程中,基层如有油渍或粉状隔离剂,应用( )火碱水刷洗,清水冲净,或用钢丝刷子彻底刷干净。",[251,252,253,254],{"key":20,"text":138,"correct":22},{"key":24,"text":21,"correct":29},{"key":27,"text":25,"correct":22},{"key":31,"text":255,"correct":22},"25%",{"id":257,"libraryId":5,"type":15,"typeLabel":16,"stem":258,"options":259,"answer":20,"analysis":33},1264243,"管道穿越的墙洞和楼板洞,应及时安放套管,并用( )水泥砂浆或细石混凝土填塞密实。",[260,262,264,266],{"key":20,"text":261,"correct":29},"1:3",{"key":24,"text":263,"correct":22},"1:2",{"key":27,"text":265,"correct":22},"1:2.5",{"key":31,"text":267,"correct":22},"1:1",{"id":269,"libraryId":5,"type":15,"typeLabel":16,"stem":270,"options":271,"answer":24,"analysis":33},1264244,"根据室内高度和抹灰现场的具体情况,提前搭好抹灰操作用的高凳和架子,架子要离开墙面及墙角( )mm,以便于操作。",[272,274,276,278],{"key":20,"text":273,"correct":22},"100～250",{"key":24,"text":275,"correct":29},"200～250",{"key":27,"text":277,"correct":22},"200～300",{"key":31,"text":279,"correct":22},"150～250",{"id":281,"libraryId":5,"type":15,"typeLabel":16,"stem":282,"options":283,"answer":24,"analysis":33},1264245,"一般抹灰工程质量的允许偏差,普通抹灰表面平整度为( )mrn。",[284,285,287,288],{"key":20,"text":108,"correct":22},{"key":24,"text":286,"correct":29},"4",{"key":27,"text":157,"correct":22},{"key":31,"text":106,"correct":22},{"id":290,"libraryId":5,"type":15,"typeLabel":16,"stem":291,"options":292,"answer":20,"analysis":33},1264246,"一般抹灰工艺为( )。",[293,295,297,299],{"key":20,"text":294,"correct":29},"基层处理→吊直、套方、找规矩、贴灰饼→墙面冲筋（设置标筋）→抹底灰→抹中层灰→抹面层灰",{"key":24,"text":296,"correct":22},"基层处理→墙面冲筋（设置标筋）→抹底灰→抹中层灰→抹面层灰",{"key":27,"text":298,"correct":22},"基层处理→吊直、套方、找规矩、贴灰饼→抹底灰→抹中层灰→抹面层灰",{"key":31,"text":300,"correct":22},"基层处理→吊直、套方、找规矩、贴灰饼→墙面冲筋（设置标筋）→抹中层灰→抹面层灰",{"id":302,"libraryId":5,"type":15,"typeLabel":16,"stem":303,"options":304,"answer":31,"analysis":33},1264247,"( )在接受交底后,应组织工人讨论,按要求施工。",[305,307,309,311],{"key":20,"text":306,"correct":22},"公司总工程师",{"key":24,"text":308,"correct":22},"分公司主任工程师或项目部的技术负责人",{"key":27,"text":310,"correct":22},"工长",{"key":31,"text":312,"correct":29},"班组长",{"id":314,"libraryId":5,"type":15,"typeLabel":16,"stem":315,"options":316,"answer":27,"analysis":33},1264248,"( )接受交底后,必要时,需作示范操作或做样板。",[317,318,319,320],{"key":20,"text":306,"correct":22},{"key":24,"text":308,"correct":22},{"key":27,"text":310,"correct":29},{"key":31,"text":312,"correct":22},{"id":322,"libraryId":5,"type":15,"typeLabel":16,"stem":323,"options":324,"answer":24,"analysis":33},1264249,"中小型工程,一般由( )向有关职能人员或施工队交底。",[325,326,327,328],{"key":20,"text":306,"correct":22},{"key":24,"text":308,"correct":29},{"key":27,"text":310,"correct":22},{"key":31,"text":312,"correct":22},{"id":330,"libraryId":5,"type":15,"typeLabel":16,"stem":331,"options":332,"answer":20,"analysis":33},1264250,"重点工程或规模大、技术复杂的工程,由( )组织有关部门向分公司和有关",[333,335,336,337,338],{"key":20,"text":334,"correct":29},"单位交底。",{"key":24,"text":306,"correct":22},{"key":27,"text":308,"correct":22},{"key":31,"text":310,"correct":22},{"key":339,"text":312,"correct":22},"E",{"id":341,"libraryId":5,"type":15,"typeLabel":16,"stem":342,"options":343,"answer":24,"analysis":33},1264251,"技术交底应根据( )不同采取相应的方法。",[344,346,348,350],{"key":20,"text":345,"correct":22},"工程规模和环境条件",{"key":24,"text":347,"correct":29},"工程规模和技术复杂程度",{"key":27,"text":349,"correct":22},"地质条件和技术复杂程度",{"key":31,"text":351,"correct":22},"工程规模和结构复杂程度",{"id":353,"libraryId":5,"type":15,"typeLabel":16,"stem":354,"options":355,"answer":20,"analysis":33},1264252,"等交底双方均认可样板操作并签字后,按( )做法施工。",[356,358,360,362],{"key":20,"text":357,"correct":29},"样板",{"key":24,"text":359,"correct":22},"标准",{"key":27,"text":361,"correct":22},"规范",{"key":31,"text":363,"correct":22},"规程",{"id":365,"libraryId":5,"type":15,"typeLabel":16,"stem":366,"options":367,"answer":27,"analysis":33},1264253,"技术交底时,遇到重要的、难度大的工程项目应该( )。",[368,370,372,374],{"key":20,"text":369,"correct":22},"书面交底和口头交底相结合",{"key":24,"text":371,"correct":22},"样板交底和口头交底相结合",{"key":27,"text":373,"correct":29},"样板交底、书面交底和口头交底相结合",{"key":31,"text":375,"correct":22},"样板交底和书面交底相结合",{"id":377,"libraryId":5,"type":15,"typeLabel":16,"stem":378,"options":379,"answer":31,"analysis":33},1264254,"分项工程技术交底指( )。",[380,382,384,386],{"key":20,"text":381,"correct":22},"使施工人员了解工程的设计特点、构造做法及要求、使用功能等,以便掌握设计关键.按图施工",{"key":24,"text":383,"correct":22},"使施工人员掌握工程特点、施工方案、任务划分、施工进度、平面布置及各项管理措施等。用先进的技术手段和科学的组织手段完成施工任务",{"key":27,"text":385,"correct":22},"将设计变更的结果及时向管理人员和施工人员说明,避免施工差错,便于经济核算",{"key":31,"text":387,"correct":29},"施工工艺、规范和规程要求、材料使用、质量标准及技术安全措施等。对新技术、新材料、新结构、新工艺、关键部位及特殊要求,要着重交代,必要时作示范",{"id":389,"libraryId":5,"type":15,"typeLabel":16,"stem":390,"options":391,"answer":27,"analysis":33},1264255,"设计变更交底指( )。",[392,394,395,396],{"key":20,"text":393,"correct":22},"使施工人员了解工程的设计特点、构造做法及要求、使用功能等,以便掌握设计关键,按图施工",{"key":24,"text":383,"correct":22},{"key":27,"text":385,"correct":29},{"key":31,"text":387,"correct":22},{"id":398,"libraryId":5,"type":15,"typeLabel":16,"stem":399,"options":400,"answer":20,"analysis":33},1264256,"图纸交底指( )。",[401,402,403,404],{"key":20,"text":393,"correct":29},{"key":24,"text":383,"correct":22},{"key":27,"text":385,"correct":22},{"key":31,"text":387,"correct":22},{"id":406,"libraryId":5,"type":15,"typeLabel":16,"stem":407,"options":408,"answer":20,"analysis":33},1264257,"选择( )是施工方案中的关键问题,它直接影响施工质量、进度、安全以及工程成本,因此在编制施工组织设计时必须加以重视。",[409,411,413,415],{"key":20,"text":410,"correct":29},"施工方法和施工机械",{"key":24,"text":412,"correct":22},"施工工序和施工方法",{"key":27,"text":414,"correct":22},"施工工序和施工机械",{"key":31,"text":416,"correct":22},"施工程序和施工方法",{"id":418,"libraryId":5,"type":15,"typeLabel":16,"stem":419,"options":420,"answer":27,"analysis":33},1264258,"下列哪项符合裱糊工程施工工艺的要求( )。",[421,423,425,427],{"key":20,"text":422,"correct":22},"要先进行面层的处理,再实施裱糊",{"key":24,"text":424,"correct":22},"要先实施裱糊,再进行面层的处理",{"key":27,"text":426,"correct":29},"要先进行基层的处理,再实施裱糊",{"key":31,"text":428,"correct":22},"要先进行基层的处理,再实施喷涂",{"id":430,"libraryId":5,"type":15,"typeLabel":16,"stem":431,"options":432,"answer":31,"analysis":33},1264259,"确定施工流程时,根据工程各部位的繁简程度,哪些部位应适当靠后施工( )。",[433,435,437,439],{"key":20,"text":434,"correct":22},"技术复杂",{"key":24,"text":436,"correct":22},"施工进度较慢",{"key":27,"text":438,"correct":22},"工期较长",{"key":31,"text":440,"correct":29},"体形复杂",{"id":442,"libraryId":5,"type":15,"typeLabel":16,"stem":443,"options":444,"answer":24,"analysis":33},1264260,"下列哪项符合吊顶工程施工工艺的要求( )。",[445,447,449,451],{"key":20,"text":446,"correct":22},"必须先同定吊筋,再安装次龙骨",{"key":24,"text":448,"correct":29},"必须先固定吊筋,再安装主次龙骨",{"key":27,"text":450,"correct":22},"必须先安装主龙骨,再固定吊筋",{"key":31,"text":452,"correct":22},"必须先安装次龙骨,再安装主龙骨",{"id":454,"libraryId":5,"type":15,"typeLabel":16,"stem":455,"options":456,"answer":31,"analysis":33},1264261,"室内装饰装修不包括哪种方式( )。",[457,459,461,463],{"key":20,"text":458,"correct":22},"自上而下",{"key":24,"text":460,"correct":22},"自下而上",{"key":27,"text":462,"correct":22},"自中而下再自上而中",{"key":31,"text":464,"correct":29},"自上下而中",{"id":466,"libraryId":5,"type":15,"typeLabel":16,"stem":467,"options":468,"answer":27,"analysis":33},1264262,"建筑装饰工程的施工程序不包括下面哪项( )。",[469,471,473,475],{"key":20,"text":470,"correct":22},"先室外后室内",{"key":24,"text":472,"correct":22},"先室内后室外",{"key":27,"text":474,"correct":29},"先上后下",{"key":31,"text":476,"correct":22},"室内外同时",{"id":478,"libraryId":5,"type":15,"typeLabel":16,"stem":479,"options":480,"answer":24,"analysis":33},1264263,"施工组织设计的核心是( )。",[481,483,485,487],{"key":20,"text":482,"correct":22},"进度计划",{"key":24,"text":484,"correct":29},"施工方案",{"key":27,"text":486,"correct":22},"现场平面设计",{"key":31,"text":488,"correct":22},"现场用电",{"id":490,"libraryId":5,"type":15,"typeLabel":16,"stem":491,"options":492,"answer":27,"analysis":33},1264264,"下列哪项属于建筑装饰装修工程施工( )。",[493,495,497,499],{"key":20,"text":494,"correct":22},"基础工程",{"key":24,"text":496,"correct":22},"设备工程",{"key":27,"text":498,"correct":29},"楼地面工程",{"key":31,"text":500,"correct":22},"主体工程",{"id":502,"libraryId":5,"type":15,"typeLabel":16,"stem":503,"options":504,"answer":31,"analysis":33},1264265,"下列哪项不属于建筑装饰装修工程施工( )。",[505,507,509,510],{"key":20,"text":506,"correct":22},"墙面装饰",{"key":24,"text":508,"correct":22},"门窗工程",{"key":27,"text":498,"correct":22},{"key":31,"text":500,"correct":29},{"id":512,"libraryId":5,"type":15,"typeLabel":16,"stem":513,"options":514,"answer":24,"analysis":33},1264266,"单位工程施工组织设计是( )。",[515,517,519,521],{"key":20,"text":516,"correct":22},"以单项工程为对象编制的",{"key":24,"text":518,"correct":29},"以单位工程为对象编制的",{"key":27,"text":520,"correct":22},"以分部工程为对象编制的",{"key":31,"text":522,"correct":22},"以分项工程为对象编制的",{"id":524,"libraryId":5,"type":15,"typeLabel":16,"stem":525,"options":526,"answer":24,"analysis":33},1264267,"装饰装修工程的施工条件有( )。",[527,529,531,533],{"key":20,"text":528,"correct":22},"人文条件和施工现场条件",{"key":24,"text":530,"correct":29},"自然条件和施工现场条件",{"key":27,"text":532,"correct":22},"自然条件和人工条件",{"key":31,"text":534,"correct":22},"地质条件和施工现场条件",{"id":536,"libraryId":5,"type":15,"typeLabel":16,"stem":537,"options":538,"answer":24,"analysis":33},1264268,"关于分部（分项）工程作业计划,以下表述错误的是( )。",[539,541,542,544],{"key":20,"text":540,"correct":22},"以某些主要的或新结构的分部（分项）工程为对象编制的",{"key":24,"text":518,"correct":29},{"key":27,"text":543,"correct":22},"以某些技术复杂的分部（分项）工程为对象编制的",{"key":31,"text":545,"correct":22},"以某些缺乏施工经验的分部（分项）工程为对象编制的",{"id":547,"libraryId":5,"type":15,"typeLabel":16,"stem":548,"options":549,"answer":27,"analysis":33},1264269,"关于分部（分项）工程作业计划,以下表述正确的是( )。",[550,552,554,556],{"key":20,"text":551,"correct":22},"是以群体工程为施工组织对象进行编制的",{"key":24,"text":553,"correct":22},"是以单位工程为对象编制的",{"key":27,"text":555,"correct":29},"以某些主要的或新结构、技术复杂的或缺乏施工经验的分部（分项）工程为对象编制的",{"key":31,"text":557,"correct":22},"设计单位和总分包单位参加共同编制",[559,562,565,568,571,574],{"id":15,"name":560,"category":7,"favorite":561},"领导干部任职前廉政法规知识测试题",92,{"id":563,"name":564,"category":7,"favorite":15},595,"建筑结构与设备",{"id":566,"name":567,"category":7,"favorite":15},715,"招标采购专业知识与法律法规",{"id":569,"name":570,"category":7,"favorite":15},848,"市政方向-通用基础",{"id":572,"name":573,"category":7,"favorite":8},534,"BIM工程师",{"id":575,"name":573,"category":7,"favorite":8},535]