[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"lib-851-1":3},{"library":4,"page":9,"limit":10,"total":11,"questions":12,"related":602},{"id":5,"name":6,"category":7,"favorite":8},851,"装饰方向-岗位技能","建筑工程",0,1,50,397,[13,33,45,57,69,81,93,105,117,129,141,149,164,172,181,193,205,217,229,241,253,265,277,289,301,309,321,333,345,357,369,381,393,405,417,429,441,450,462,474,486,498,510,522,534,546,558,570,578,590],{"id":14,"libraryId":5,"type":9,"typeLabel":15,"stem":16,"options":17,"answer":19,"analysis":32},1264120,"单选题","关于自动安平红外激光投线仪表述错误的是( )。",[18,22,26,29],{"key":19,"text":20,"correct":21},"A","仪器可产生五个激光平面（一个水平面和四个正交铅垂面,投射到墙上产生激光线）和一个激光下对点。两个垂直面在天顶不相交",true,{"key":23,"text":24,"correct":25},"B","仪器自动安平范围大,放在较为平整的物体上,或装在脚架上调整至水泡居中即可",false,{"key":27,"text":28,"correct":25},"C","可转动仪器使激光束到达各个方向。微调仪器,能方便、精确地找准目标",{"key":30,"text":31,"correct":25},"D","自动报警功能可使仪器在倾斜超出安平范围时激光线闪烁,并报警","",{"id":34,"libraryId":5,"type":9,"typeLabel":15,"stem":35,"options":36,"answer":27,"analysis":32},1264121,"关于型材切割机的使用,表述错误的是( )。",[37,39,41,43],{"key":19,"text":38,"correct":25},"工作前应检查电源电压与切割机的额定电压是否相符,机具防护是否安全有效,开关是否灵敏,电动机运转是否正常",{"key":23,"text":40,"correct":25},"工作时应按照工件厚度与形状调整夹钳的位置,将工件平直地靠住导板,并放在所需切割位置上,然后拧紧螺杆,紧同好工件",{"key":27,"text":42,"correct":21},"切割时,应使材料有一个与切割片同等厚度的刀口,为保证切割精度,应将切割线对准切割片的中线",{"key":30,"text":44,"correct":25},"若工件需切割出一定角度,则可以用套筒扳手拧松导板固定螺栓,把导板调整列所需角度后,拧紧螺栓即可",{"id":46,"libraryId":5,"type":9,"typeLabel":15,"stem":47,"options":48,"answer":19,"analysis":32},1264122,"喷枪的空气压力一般为( )MPa,如果压力过大或过小,可调节空气调节旋钮。",[49,51,53,55],{"key":19,"text":50,"correct":21},"0.3～0.35",{"key":23,"text":52,"correct":25},"0.2--0.25",{"key":27,"text":54,"correct":25},"0.35～0.4",{"key":30,"text":56,"correct":25},"0.25～0.3",{"id":58,"libraryId":5,"type":9,"typeLabel":15,"stem":59,"options":60,"answer":23,"analysis":32},1264123,"喷枪是装饰装修工程中面层装饰施工的常用机具之一,主要用于装饰施工中面层处理,下列选项中不包括( )。",[61,63,65,67],{"key":19,"text":62,"correct":25},"清洁面层",{"key":23,"text":64,"correct":21},"保湿面层",{"key":27,"text":66,"correct":25},"面层喷涂",{"key":30,"text":68,"correct":25},"建筑画的喷绘",{"id":70,"libraryId":5,"type":9,"typeLabel":15,"stem":71,"options":72,"answer":23,"analysis":32},1264124,"使用前应检查滑轮的轮槽、轮轴、颊板、吊钩等部分有无裂缝或损伤,滑轮转动是否灵活,润滑是否良好,同时滑轮槽宽应比钢丝绳直径大( )mm。",[73,75,77,79],{"key":19,"text":74,"correct":25},"1～2",{"key":23,"text":76,"correct":21},"1～2.5",{"key":27,"text":78,"correct":25},"1～3",{"key":30,"text":80,"correct":25},"1～1.5",{"id":82,"libraryId":5,"type":9,"typeLabel":15,"stem":83,"options":84,"answer":30,"analysis":32},1264125,"起升机构不得使用编结接长的钢丝绳。使用其他方法接长钢丝绳时,必须保证接头强度不小于钢丝绳破断拉力的( )。",[85,87,89,91],{"key":19,"text":86,"correct":25},"60%",{"key":23,"text":88,"correct":25},"70%",{"key":27,"text":90,"correct":25},"80%",{"key":30,"text":92,"correct":21},"90%",{"id":94,"libraryId":5,"type":9,"typeLabel":15,"stem":95,"options":96,"answer":19,"analysis":32},1264126,"下列关于钢丝绳的注意事项表述错误的是( )。",[97,99,101,103],{"key":19,"text":98,"correct":21},"常用设备吊装时钢丝绳安全系数不小于5",{"key":23,"text":100,"correct":25},"钢丝绳穿用的滑车,其边缘不应有破裂和缺口",{"key":27,"text":102,"correct":25},"钢丝绳在卷筒上应能按顺序整齐排列",{"key":30,"text":104,"correct":25},"起升高度较大的起重机,宜采用不旋转、无松散倾向的钢丝绳",{"id":106,"libraryId":5,"type":9,"typeLabel":15,"stem":107,"options":108,"answer":19,"analysis":32},1264127,"当电梯未切断总源开关前,( )不能离开操作岗位。",[109,111,113,115],{"key":19,"text":110,"correct":21},"司机",{"key":23,"text":112,"correct":25},"操作人员",{"key":27,"text":114,"correct":25},"安全员",{"key":30,"text":116,"correct":25},"工作人员",{"id":118,"libraryId":5,"type":9,"typeLabel":15,"stem":119,"options":120,"answer":27,"analysis":32},1264128,"风力达( )级以上应停止使用电梯,并将电梯降到低层。",[121,123,125,127],{"key":19,"text":122,"correct":25},"4",{"key":23,"text":124,"correct":25},"5",{"key":27,"text":126,"correct":21},"6",{"key":30,"text":128,"correct":25},"7",{"id":130,"libraryId":5,"type":9,"typeLabel":15,"stem":131,"options":132,"answer":27,"analysis":32},1264129,"施工电梯使用要点与注意事项,其中错误的是( )。",[133,135,137,139],{"key":19,"text":134,"correct":25},"施工电梯安装后,安全装置要经试验、检测合格后方可操作使用,电梯必须由持证的专业司机操作",{"key":23,"text":136,"correct":25},"电梯底笼周围2.Sm范围内,必须设置稳固的防护栏杆,各停靠层的过桥和运输通道应平整牢固,出人口的栏杆应安全可靠",{"key":27,"text":138,"correct":21},"电梯每班首次运行时,应空载及满载试运行,将电梯笼升离地面2m左右停车、检查制动器灵活性,确认正常后方可投入运行",{"key":30,"text":140,"correct":25},"限速器、制动器等安全装置必须由专人管理,并按规定进行调试检查,保持其灵敏度可靠",{"id":142,"libraryId":5,"type":9,"typeLabel":15,"stem":143,"options":144,"answer":23,"analysis":32},1264130,"( )在使用吊篮施工时,不得向外攀爬和向楼内跳跃。",[145,146,147,148],{"key":19,"text":110,"correct":25},{"key":23,"text":112,"correct":21},{"key":27,"text":114,"correct":25},{"key":30,"text":116,"correct":25},{"id":150,"libraryId":5,"type":9,"typeLabel":15,"stem":151,"options":152,"answer":27,"analysis":32},1264131,"使用悬挂电气控制开关时,绝缘应良好,滑动自如,人的站立位置后方应有( )",[153,155,157,159,161],{"key":19,"text":154,"correct":25},"地并应正常操作电钮。",{"key":23,"text":156,"correct":25},"1",{"key":27,"text":158,"correct":21},"1.5",{"key":30,"text":160,"correct":25},"2",{"key":162,"text":163,"correct":25},"E","2.5",{"id":165,"libraryId":5,"type":9,"typeLabel":15,"stem":166,"options":167,"answer":23,"analysis":32},1264132,"起吊物件应捆扎牢固。电动吊篮吊重物行走时,重物离地面高度不宜超过( )m。",[168,169,170,171],{"key":19,"text":156,"correct":25},{"key":23,"text":158,"correct":21},{"key":27,"text":160,"correct":25},{"key":30,"text":163,"correct":25},{"id":173,"libraryId":5,"type":9,"typeLabel":15,"stem":174,"options":175,"answer":23,"analysis":32},1264133,"每次使用前均应在( )m高度下空载运行2～3次,确认无故障方可使用。",[176,177,178,180],{"key":19,"text":156,"correct":25},{"key":23,"text":160,"correct":21},{"key":27,"text":179,"correct":25},"3",{"key":30,"text":122,"correct":25},{"id":182,"libraryId":5,"type":9,"typeLabel":15,"stem":183,"options":184,"answer":30,"analysis":32},1264134,"作业开始第一次吊重物时,应在吊离地面( )mm时停止,检查捌链制动情况,确认完好后方可正式作业,露天作业时,应设防雨措施,保证电机、电控等安全。",[185,187,189,191],{"key":19,"text":186,"correct":25},"50",{"key":23,"text":188,"correct":25},"60",{"key":27,"text":190,"correct":25},"80",{"key":30,"text":192,"correct":21},"100",{"id":194,"libraryId":5,"type":9,"typeLabel":15,"stem":195,"options":196,"answer":27,"analysis":32},1264135,"横道图法具有形象、直观、一目了然等优点,它能够准确表达出费用的( )。",[197,199,201,203],{"key":19,"text":198,"correct":25},"统计偏差",{"key":23,"text":200,"correct":25},"平均偏差",{"key":27,"text":202,"correct":21},"绝对偏差",{"key":30,"text":204,"correct":25},"相对偏差",{"id":206,"libraryId":5,"type":9,"typeLabel":15,"stem":207,"options":208,"answer":19,"analysis":32},1264136,"施工成本偏差分析可采用不同的表达方法,常用的有( )。",[209,211,213,215],{"key":19,"text":210,"correct":21},"横道图法、表格法和赢得值评价曲线法",{"key":23,"text":212,"correct":25},"网络图法、横道图法和表格法",{"key":27,"text":214,"correct":25},"比较法、因素分析法和差额计算法",{"key":30,"text":216,"correct":25},"网络图法、表格法和赢得值评价曲线法",{"id":218,"libraryId":5,"type":9,"typeLabel":15,"stem":219,"options":220,"answer":30,"analysis":32},1264137,"偏差分析可采用不同的方法,不能进行偏差分析的方法是( )。",[221,223,225,227],{"key":19,"text":222,"correct":25},"横道图法",{"key":23,"text":224,"correct":25},"表格法",{"key":27,"text":226,"correct":25},"赢得值评价曲线法",{"key":30,"text":228,"correct":21},"对比法",{"id":230,"libraryId":5,"type":9,"typeLabel":15,"stem":231,"options":232,"answer":27,"analysis":32},1264138,"关于工程量清单的计价模式的特点描述正确的是( )。",[233,235,237,239],{"key":19,"text":234,"correct":25},"按清单计价的模式",{"key":23,"text":236,"correct":25},"量价合一的模式",{"key":27,"text":238,"correct":21},"量价分离的模式",{"key":30,"text":240,"correct":25},"自主报价的模式",{"id":242,"libraryId":5,"type":9,"typeLabel":15,"stem":243,"options":244,"answer":19,"analysis":32},1264139,"某项目进行成本偏差分析,结果为:已完工作预算成本(BCWP)已完工作实际成本(ACWP)＜0;已完工作预算成本(BCWP)一计划完成工作预算成本(BCWS》＞0。则说明( )。",[245,247,249,251],{"key":19,"text":246,"correct":21},"成本超支,进度提前",{"key":23,"text":248,"correct":25},"成本节约,进度提前",{"key":27,"text":250,"correct":25},"成本超支,进度拖后",{"key":30,"text":252,"correct":25},"成本节约,进度拖后",{"id":254,"libraryId":5,"type":9,"typeLabel":15,"stem":255,"options":256,"answer":30,"analysis":32},1264140,"施工成本控制的步骤中,最具实质性的一步是( )。",[257,259,261,263],{"key":19,"text":258,"correct":25},"预测",{"key":23,"text":260,"correct":25},"比较",{"key":27,"text":262,"correct":25},"分析",{"key":30,"text":264,"correct":21},"纠偏",{"id":266,"libraryId":5,"type":9,"typeLabel":15,"stem":267,"options":268,"answer":30,"analysis":32},1264141,"施工成本控制过程中的动态资料是( )。",[269,271,273,275],{"key":19,"text":270,"correct":25},"合同文件和工程变更资料",{"key":23,"text":272,"correct":25},"工程索赔资料和成本计划",{"key":27,"text":274,"correct":25},"合同文件和成本计划",{"key":30,"text":276,"correct":21},"进度报告和工程变更资料",{"id":278,"libraryId":5,"type":9,"typeLabel":15,"stem":279,"options":280,"answer":19,"analysis":32},1264142,"衡量成本降低的实际成果,并对成本指标完成情况进行总结和评价的是( )。",[281,283,285,287],{"key":19,"text":282,"correct":21},"施工成本考核",{"key":23,"text":284,"correct":25},"施工成本计划",{"key":27,"text":286,"correct":25},"施工成本预测",{"key":30,"text":288,"correct":25},"施工成本核算",{"id":290,"libraryId":5,"type":9,"typeLabel":15,"stem":291,"options":292,"answer":30,"analysis":32},1264143,"施工成本分析是施工成本管理的主要任务之一,下列关于施工成本分析的表述中正确的是( )。",[293,295,297,299],{"key":19,"text":294,"correct":25},"施工成本分析的实质是在施工之前对成本进行估算",{"key":23,"text":296,"correct":25},"施工成本分析是指科学地预测成本水平及其发展趋势",{"key":27,"text":298,"correct":25},"施工成本分析是指预测成本控制的薄弱环节",{"key":30,"text":300,"correct":21},"施工成本分析应贯穿于施工成本管理的全过程",{"id":302,"libraryId":5,"type":9,"typeLabel":15,"stem":303,"options":304,"answer":27,"analysis":32},1264144,"施工成本分析是在( )的基础上,对成本的形成过程和影响因素进行分析。",[305,306,307,308],{"key":19,"text":284,"correct":25},{"key":23,"text":286,"correct":25},{"key":27,"text":288,"correct":21},{"key":30,"text":282,"correct":25},{"id":310,"libraryId":5,"type":9,"typeLabel":15,"stem":311,"options":312,"answer":23,"analysis":32},1264145,"( )是把企业生产经营发生的一切费用全部吸收到产品成本之中。",[313,315,317,319],{"key":19,"text":314,"correct":25},"制造成本法",{"key":23,"text":316,"correct":21},"完全成本法",{"key":27,"text":318,"correct":25},"不完全成本法",{"key":30,"text":320,"correct":25},"经营成本法",{"id":322,"libraryId":5,"type":9,"typeLabel":15,"stem":323,"options":324,"answer":19,"analysis":32},1264146,"项目经理部对竣工工程成本核算的目的是( )。",[325,327,329,331],{"key":19,"text":326,"correct":21},"考核项目管理绩效",{"key":23,"text":328,"correct":25},"寻求进一步降低成本的途径",{"key":27,"text":330,"correct":25},"考核企业经营效益",{"key":30,"text":332,"correct":25},"分析成本偏差的原因",{"id":334,"libraryId":5,"type":9,"typeLabel":15,"stem":335,"options":336,"answer":23,"analysis":32},1264147,"施工项目成本控制工作从施工项目( )开始直到竣工验收,贯穿于全过程。",[337,339,341,343],{"key":19,"text":338,"correct":25},"设计阶段",{"key":23,"text":340,"correct":21},"投标阶段",{"key":27,"text":342,"correct":25},"施工准备阶段",{"key":30,"text":344,"correct":25},"正式开工",{"id":346,"libraryId":5,"type":9,"typeLabel":15,"stem":347,"options":348,"answer":27,"analysis":32},1264148,"施工成本控制的工作内容之一是计算和分析( )之间的差异。",[349,351,353,355],{"key":19,"text":350,"correct":25},"预测成本与实际成本",{"key":23,"text":352,"correct":25},"预算成本与计划成本",{"key":27,"text":354,"correct":21},"计划成本与实际成本",{"key":30,"text":356,"correct":25},"预算成本与实际成本",{"id":358,"libraryId":5,"type":9,"typeLabel":15,"stem":359,"options":360,"answer":19,"analysis":32},1264149,"在项目的实施过程中,需按( )对实际施工成本的发生过程进行有效控制。",[361,363,365,367],{"key":19,"text":362,"correct":21},"动态控制原理",{"key":23,"text":364,"correct":25},"静态控制原理",{"key":27,"text":366,"correct":25},"宏观控制原理",{"key":30,"text":368,"correct":25},"微观控制原理",{"id":370,"libraryId":5,"type":9,"typeLabel":15,"stem":371,"options":372,"answer":27,"analysis":32},1264150,"作为施工企业全面成本管理的重要环节,施工项目成本控制应贯穿于项目( )的全过程。",[373,375,377,379],{"key":19,"text":374,"correct":25},"从策划开始到项目开始运营",{"key":23,"text":376,"correct":25},"从设计开始到项目开始运营",{"key":27,"text":378,"correct":21},"从投标开始到项目竣工验收",{"key":30,"text":380,"correct":25},"从施工开始到项目竣工验收",{"id":382,"libraryId":5,"type":9,"typeLabel":15,"stem":383,"options":384,"answer":27,"analysis":32},1264151,"对施工项目而言,编制施工成本计划的主要作用是( )。",[385,387,389,391],{"key":19,"text":386,"correct":25},"确定成本定额水平",{"key":23,"text":388,"correct":25},"对实际成本进行估算",{"key":27,"text":390,"correct":21},"设立目标成本",{"key":30,"text":392,"correct":25},"明确资金使用安排",{"id":394,"libraryId":5,"type":9,"typeLabel":15,"stem":395,"options":396,"answer":30,"analysis":32},1264152,"下列选项中,不属于施工成本计划指标的是( )。",[397,399,401,403],{"key":19,"text":398,"correct":25},"成本计划的质量指标",{"key":23,"text":400,"correct":25},"成本计划的效益指标",{"key":27,"text":402,"correct":25},"成本计划的数量指标",{"key":30,"text":404,"correct":21},"成本计划的功能指标",{"id":406,"libraryId":5,"type":9,"typeLabel":15,"stem":407,"options":408,"answer":27,"analysis":32},1264153,"施工成本计划应满足的要求不包括( )。",[409,411,413,415],{"key":19,"text":410,"correct":25},"以经济合理的项目实施方案为基础的要求",{"key":23,"text":412,"correct":25},"合同规定的项目质量和工期要求",{"key":27,"text":414,"correct":21},"控制影响效率的其他因素的要求",{"key":30,"text":416,"correct":25},"有关定额及市场价格的要求",{"id":418,"libraryId":5,"type":9,"typeLabel":15,"stem":419,"options":420,"answer":19,"analysis":32},1264154,"按成本性质划分的单位工程成本汇总表,根据清单项目的造价分析,分别对人工费、材料费、机械费、措施费、( )进行汇总,形成单位工程成本计划表。",[421,423,425,427],{"key":19,"text":422,"correct":21},"企业管理费和税费",{"key":23,"text":424,"correct":25},"直接费和间接费",{"key":27,"text":426,"correct":25},"间接费和企业管理费",{"key":30,"text":428,"correct":25},"间接费、利润和税金",{"id":430,"libraryId":5,"type":9,"typeLabel":15,"stem":431,"options":432,"answer":23,"analysis":32},1264155,"施工成本计划通常有三类指标,即( )。",[433,435,437,439],{"key":19,"text":434,"correct":25},"拟定工作预算成本指标,已完成工作预算成本指标和成本降低率指标",{"key":23,"text":436,"correct":21},"成本计划的数量指标、质量指标和效益指标",{"key":27,"text":438,"correct":25},"预算成本指标、计划成本指标和实际成本指标",{"key":30,"text":440,"correct":25},"人、财、物成本指标",{"id":442,"libraryId":5,"type":9,"typeLabel":15,"stem":443,"options":444,"answer":23,"analysis":32},1264156,"( )是以货币形式编制施工项目在计划期内的生产费用、成本水平、成本降低率以及为降低成本所采取的主要措施和规划的书面方案。",[445,446,447,449],{"key":19,"text":286,"correct":25},{"key":23,"text":284,"correct":21},{"key":27,"text":448,"correct":25},"施工成本控制",{"key":30,"text":288,"correct":25},{"id":451,"libraryId":5,"type":9,"typeLabel":15,"stem":452,"options":453,"answer":23,"analysis":32},1264157,"施工成本预测的实质是在施工项目的施工之前( )。",[454,456,458,460],{"key":19,"text":455,"correct":25},"对成本因素进行分析",{"key":23,"text":457,"correct":21},"分析可能的影响程度",{"key":27,"text":459,"correct":25},"估算计划与实际成本之间的可能差异",{"key":30,"text":461,"correct":25},"对成本进行估算",{"id":463,"libraryId":5,"type":9,"typeLabel":15,"stem":464,"options":465,"answer":19,"analysis":32},1264158,"成本决策的决策是( )。",[466,468,470,472],{"key":19,"text":467,"correct":21},"成本预测",{"key":23,"text":469,"correct":25},"成本计划",{"key":27,"text":471,"correct":25},"成本分析",{"key":30,"text":473,"correct":25},"成本控制",{"id":475,"libraryId":5,"type":9,"typeLabel":15,"stem":476,"options":477,"answer":23,"analysis":32},1264159,"施工成本管理的目的是利用组织、经济、技术和合同等措施( )。",[478,480,482,484],{"key":19,"text":479,"correct":25},"全面分析实际成本的变动状态",{"key":23,"text":481,"correct":21},"将实际成本控制在计划范围内",{"key":27,"text":483,"correct":25},"严格控制计划成本的变动范围",{"key":30,"text":485,"correct":25},"把计划成本控制在目标范围内",{"id":487,"libraryId":5,"type":9,"typeLabel":15,"stem":488,"options":489,"answer":23,"analysis":32},1264160,"工程成本是指( )为取得并完成某项工程所支付的各种费用的总和。",[490,492,494,496],{"key":19,"text":491,"correct":25},"施工队伍",{"key":23,"text":493,"correct":21},"施工企业",{"key":27,"text":495,"correct":25},"建设单位",{"key":30,"text":497,"correct":25},"项目经理",{"id":499,"libraryId":5,"type":9,"typeLabel":15,"stem":500,"options":501,"answer":19,"analysis":32},1264161,"关于工程成本描述正确的是( )。",[502,504,506,508],{"key":19,"text":503,"correct":21},"指施工企业或项目部为取得并完成某项工程所支付的各种费用的总和",{"key":23,"text":505,"correct":25},"合同价",{"key":27,"text":507,"correct":25},"发包方应付的除利润以外的工程款",{"key":30,"text":509,"correct":25},"发包方应付的除利润、税金以外的工程款",{"id":511,"libraryId":5,"type":9,"typeLabel":15,"stem":512,"options":513,"answer":30,"analysis":32},1264162,"下列不属于工程造价特点的是( )。",[514,516,518,520],{"key":19,"text":515,"correct":25},"大额性",{"key":23,"text":517,"correct":25},"单件性",{"key":27,"text":519,"correct":25},"层次性",{"key":30,"text":521,"correct":21},"复杂性",{"id":523,"libraryId":5,"type":9,"typeLabel":15,"stem":524,"options":525,"answer":27,"analysis":32},1264163,"不用进行工料调差的计价方法为( )。",[526,528,530,532],{"key":19,"text":527,"correct":25},"单价法",{"key":23,"text":529,"correct":25},"综合单价法",{"key":27,"text":531,"correct":21},"实物法",{"key":30,"text":533,"correct":25},"按市场价",{"id":535,"libraryId":5,"type":9,"typeLabel":15,"stem":536,"options":537,"answer":30,"analysis":32},1264164,"下列不属于工程质量管理特点的是( )。",[538,540,542,544],{"key":19,"text":539,"correct":25},"工程项目的质量特性较多",{"key":23,"text":541,"correct":25},"工程项目形体庞大,高投入,周期长,牵涉面广,具有风险性",{"key":27,"text":543,"correct":25},"影响工程项目质量的因素多",{"key":30,"text":545,"correct":21},"工程项目质量具有局限性",{"id":547,"libraryId":5,"type":9,"typeLabel":15,"stem":548,"options":549,"answer":23,"analysis":32},1264165,"关于事故的等级,以下表述错误的是( )。",[550,552,554,556],{"key":19,"text":551,"correct":25},"重大事故,是指造成10人以上30人以下死亡,或者50人以上100人以下重伤,或者5000万元以上1亿元以下直接经济损失的事故",{"key":23,"text":553,"correct":21},"较大事故,是指造成5人以上10人以下死亡,或者10人以上50人以下重伤,或者1000万元以上5000万元以下直接经济损失的事故",{"key":27,"text":555,"correct":25},"一般事故,是指造成3人以下死亡,或者10人以下重伤,或者1000万元以下100万元以上直接经济损失的事故",{"key":30,"text":557,"correct":25},"等级划分所称的以上包括本数,所称的以下不包括本数",{"id":559,"libraryId":5,"type":9,"typeLabel":15,"stem":560,"options":561,"answer":23,"analysis":32},1264166,"照明专用回路设置漏电保护器,灯具金属外壳作接零保护,室内线路及灯具安装高度( )m的应有使用安全电压。",[562,564,566,568],{"key":19,"text":563,"correct":25},"高于2.5",{"key":23,"text":565,"correct":21},"低于2.5",{"key":27,"text":567,"correct":25},"高于1.5",{"key":30,"text":569,"correct":25},"低于15",{"id":571,"libraryId":5,"type":9,"typeLabel":15,"stem":572,"options":573,"answer":27,"analysis":32},1264167,"配电箱设在干燥通风的场所,周围不得堆放任何妨碍操作、维修的物品,并与被控制的固定设备距离不得超过( )m。",[574,575,576,577],{"key":19,"text":124,"correct":25},{"key":23,"text":126,"correct":25},{"key":27,"text":179,"correct":21},{"key":30,"text":160,"correct":25},{"id":579,"libraryId":5,"type":9,"typeLabel":15,"stem":580,"options":581,"answer":30,"analysis":32},1264168,"下列不属于施工现场事故处理的是( )。",[582,584,586,588],{"key":19,"text":583,"correct":25},"施工现场水污染的处理",{"key":23,"text":585,"correct":25},"施工现场噪声污染的处理",{"key":27,"text":587,"correct":25},"施工现场空气污染的处理",{"key":30,"text":589,"correct":21},"施工现场有害气体的处理",{"id":591,"libraryId":5,"type":9,"typeLabel":15,"stem":592,"options":593,"answer":27,"analysis":32},1264169,"根据环境科学理论,可将固体废物的治理防腐概括为无害化、安定化和( )三种。",[594,596,598,600],{"key":19,"text":595,"correct":25},"填埋化",{"key":23,"text":597,"correct":25},"浓缩化",{"key":27,"text":599,"correct":21},"减量化",{"key":30,"text":601,"correct":25},"膨胀化",[603,606,609,612,615,618],{"id":9,"name":604,"category":7,"favorite":605},"领导干部任职前廉政法规知识测试题",92,{"id":607,"name":608,"category":7,"favorite":9},595,"建筑结构与设备",{"id":610,"name":611,"category":7,"favorite":9},715,"招标采购专业知识与法律法规",{"id":613,"name":614,"category":7,"favorite":9},848,"市政方向-通用基础",{"id":616,"name":617,"category":7,"favorite":8},534,"BIM工程师",{"id":619,"name":617,"category":7,"favorite":8},535]