[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264436":3},{"question":4,"library":20},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":17,"analysis":19},1264436,851,3,"判断题","建设工程项目施工成本管理应从工程施工开始,直至项目竣工结算完成为止,贯穿于项目实施的全过程。",[11,15],{"key":12,"text":13,"correct":14},"A","正确",false,{"key":16,"text":17,"correct":18},"B","错误",true,"",{"id":6,"name":21,"category":22,"favorite":23},"装饰方向-岗位技能","建筑工程",0]