[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264400":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1264400,851,2,"多选题","确定施工流程时,根据工程各部位的繁简程度,哪些部位应优先施工( )。",[11,15,18,21,25],{"key":12,"text":13,"correct":14},"A","技术复杂",true,{"key":16,"text":17,"correct":14},"B","施工进度较慢",{"key":19,"text":20,"correct":14},"C","工期较长",{"key":22,"text":23,"correct":24},"D","体形复杂",false,{"key":26,"text":27,"correct":24},"E","技术简单","ABC","",{"id":6,"name":31,"category":32,"favorite":33},"装饰方向-岗位技能","建筑工程",0]