[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264399":3},{"question":4,"library":30},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":28,"analysis":29},1264399,851,2,"多选题","室内装饰装修工程,施工顺序应根据具体条件来确定,基本原则不包括( )。",[11,15,19,22,25],{"key":12,"text":13,"correct":14},"A","先湿作业、后干作业",false,{"key":16,"text":17,"correct":18},"B","先下后上",true,{"key":20,"text":21,"correct":14},"C","先墙顶、后地面",{"key":23,"text":24,"correct":18},"D","先外后内",{"key":26,"text":27,"correct":14},"E","先管线、后饰面","BD","",{"id":6,"name":31,"category":32,"favorite":33},"装饰方向-岗位技能","建筑工程",0]