[{"data":1,"prerenderedAt":-1},["ShallowReactive",2],{"q-1264283":3},{"question":4,"library":26},{"id":5,"libraryId":6,"type":7,"typeLabel":8,"stem":9,"options":10,"answer":12,"analysis":25},1264283,851,1,"单选题","专项方案实施前,编制人员或项目技术负责人应当向现场管理人员和作业人员进行( )交底。",[11,15,19,22],{"key":12,"text":13,"correct":14},"A","安全技术",true,{"key":16,"text":17,"correct":18},"B","图纸",false,{"key":20,"text":21,"correct":18},"C","施工组织设计",{"key":23,"text":24,"correct":18},"D","分项工程技术","",{"id":6,"name":27,"category":28,"favorite":29},"装饰方向-岗位技能","建筑工程",0]